MONOGRAPH ON TEST AND MEASUREMENT TECHNOLOGY OF ROCK MECHANICS AND ENGINEERING

Technique of Additional Mass Method for Rockfill Density Measurement and Evaluation of Its Application

  • ZHANG Jian-Qing ,
  • ZHOU Zheng-Quan ,
  • CAI Jia-Xing ,
  • MA Sheng-Min ,
  • MA Qi
Expand
  • 1.Changjiang Engineering Geophysical Exploration Wuhan Co., Ltd., Wuhan 430010, China; 2.Yunnan Huaneng Lancang River Hydropower Company, Kunming 650214, China

Received date: 2012-05-23

  Online published: 2012-08-22

Abstract

 The additional mass method was applied to detect rockfill density quickly and accurately, and to control the quality of dam filling in-time. Key technologies in the application of additional mass method are elaborated in this paper, including the obtaining of rockfill density through correlation method, the data collection and  processing system, the quality control evaluation system, and the 3-D digitalization. Remote control on the construction quality and digital measurement of the rockfill density were realized by using GPRS to build the data network link between local and remote network. The method was applied to Nuozhadu hydropower station, and good results were achieved.

Cite this article

ZHANG Jian-Qing , ZHOU Zheng-Quan , CAI Jia-Xing , MA Sheng-Min , MA Qi . Technique of Additional Mass Method for Rockfill Density Measurement and Evaluation of Its Application[J]. Journal of Changjiang River Scientific Research Institute, 2012 , 29(8) : 45 -51 . DOI: 10.3969/j.issn.1001-5485.2012.08.009

Outlines

/

〈 〉