Key Technologies for Managing the Power Supply of Wireless Uplift Monitoring Device

LI Bin, GUO Liang, LIU Shuang-hua, ZHAN Cheng-yuan, WANG Lu

Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (3) : 150-154.

PDF(1291 KB)
PDF(1291 KB)
Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (3) : 150-154. DOI: 10.11988/ckyyb.20181225
INSTRUMENTATION DEVELOPMENT AND TESTING TECHNIQUES

Key Technologies for Managing the Power Supply of Wireless Uplift Monitoring Device

  • LI Bin1, GUO Liang2, LIU Shuang-hua1, ZHAN Cheng-yuan2, WANG Lu2
Author information +
History +

Abstract

Largely applied for the toe plate of Fengning pumped storage power station, curtain grouting easily brings about deformation to the toe plate under excessive pressure. Such uplift deformation of the toe plate requires consecutive monitoring for 24 hours a day. Nevertheless, current devices for uplift monitoring costs 8 hours to be fully charged, while only works uninterruptedly for 3-4 hours. In view of this, the working mode of the device was adjusted through micro-control according to the variation of monitoring value, and fast charging was designed by adjusting the charging current using PWM. The charging time was reduced to 1.8 hours, whereas the consecutive working time of the device elongated to be 134 hours, and meanwhile the average working current was reduced, remarkably enhancing the monitoring efficiency.

Key words

uplift monitoring device / power supply management / curtain grouting / deformation of toe plate / fast charging / Mas law

Cite this article

Download Citations
LI Bin, GUO Liang, LIU Shuang-hua, ZHAN Cheng-yuan, WANG Lu. Key Technologies for Managing the Power Supply of Wireless Uplift Monitoring Device[J]. Journal of Changjiang River Scientific Research Institute. 2020, 37(3): 150-154 https://doi.org/10.11988/ckyyb.20181225

References

[1] 孟 吉,一种新型的灌浆施工抬动观测方法及装置.四川水力发电,2013,32(5):94-97.
[2] 阳晓东,刘俊松.白鹤滩水电站左岸进水口基础固结灌浆抬动控制.水利水电技术,2017,48(增刊2):122-125.
[3] 陈 娟,徐力生,徐 蒙.地层抬动测量装置的研究.传感器与微系统,2010,29(10):37-38.
[4] 夏可风,龙达云.灌浆自动记录仪和灌浆施工自动化.水力发电,1994(3):24-25.
[5] 陈 娟,徐力生,徐 蒙.注浆压力动载荷作用下盖重非线性响应简化分析.湖南大学学报(自然科学版),2015,42(1):68-74.
[6] 盛 辉,丁修乘,郭毅锋.锂离子动力电池脉冲快速充电实验研究 .电源技术,2016,40(6):1172-1175.
[7] 吴铁洲,白 婷,胡丽平,等.间歇-正负脉冲蓄电池快速充电方法的研究.电子器件,2014,37(6):1245-1250.
[8] 肖辽亮.基于MSP430铅蓄电池快速充电系统的研究与设计.电源技术研究与设计,2017,41(5):737.
[9] 李匡成,杨亚丽,刘 岩.模糊控制充电技术中去极化脉冲的估算.电源技术,2014,38(3):492-494.
[10] 马进红,王正仕,苏秀蓉.锂离子动力电池大电流脉冲充电特性研究.电源学报,2013,11(1):30-33.
PDF(1291 KB)

Accesses

Citation

Detail

Sections
Recommended

/