Geomechanical Model Test on Global Stability of Wudongde Double-curvature Arch Dam

JIANG Yu-zhou,JIANG Xiao-lan,WANG Rui-hong,ZHU Jie-bing

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (10) : 139-145.

PDF(2186 KB)
PDF(2186 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (10) : 139-145. DOI: 10.3969/j.issn.1001-5485.2014.10.022
ROCK-SOIL ENGINEERING

Geomechanical Model Test on Global Stability of Wudongde Double-curvature Arch Dam

  • JIANG Yu-zhou1,JIANG Xiao-lan1,WANG Rui-hong2,ZHU Jie-bing1
Author information +
History +

Abstract

The global stability of Wudongde double-curvature arch dam is researched by using 3-D geomechanical model in overloading condition. The mechanics behaviors and complex geological structures including discontinuous planes and beddings of dam foundation and abutment are simulated with a model of 1∶300 scale. Through the overloading model test, the deformation characters, failure process, failure pattern and overloading capacity of arch dam are obtained, and the global safety of arch dam and dam foundation is assessed. Furthermore, the displacement fields under normal water-storage level condition and overloading condition are analyzed, relative displacements at typical points on the beddings are obtained, and crack development before and after the failure are described. Results indicate that under design load, the arch dam body and abutments on both sides are stable and the deformation is linear; the overloading factor k1 for crack initiation in dam heel ranges from 1.7 to 2.0, the nonlinear deformation overloading factor k2=3.5~4.0, and the ultimate overloading factor k3=6.0~7.0.

Key words

Wudongde hydroelectric power station / global stability of arch dam / 3D geomechanical model / overloading test

Cite this article

Download Citations
JIANG Yu-zhou,JIANG Xiao-lan,WANG Rui-hong,ZHU Jie-bing. Geomechanical Model Test on Global Stability of Wudongde Double-curvature Arch Dam[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(10): 139-145 https://doi.org/10.3969/j.issn.1001-5485.2014.10.022

References

[1] 沈 泰. 地质力学模型试验技术的进展[J].长江科学院院报,2001,18(5):32-35.(SHEN Tai. Development of Geomechanical Model Experiment Techniques[J].Journal of Yangtze River Scientific Research Institute,2001,18(5):32-35.(in Chinese))
[2] 龚召熊, 陈 进. 岩石力学模型试验及其在三峡工程中得应用与发展[M ]. 北京: 水利电力出版社, 1996. (GONG Zhao-xiong, CHEN Jin. Rock Mechanics Model Test and Its Application in the Three Gorges Project Development[M]. Beijing: Water Conservancy and Electric Power Press, 1996. (in Chinese))
[3] 周维垣,杨若琼,杨 强. 复杂地基上二滩双曲拱坝整体稳定分析[J]. 岩石力学与工程学报,1992,11(1):25-34. (ZHOU Wei-yuan,YANG Ruo-qiong,YANG Qiang. The Monolithic Stability Analysis of Ertan Arch Dam in Complex Rock Formations[J]. Chinese Journal of Rock Mechanics and Engineering,1992,11(1):25-34.(in Chinese))
[4] 陈 进,赖跃强. 隔河岩重力拱坝加固方案地质力学模型试验研究[J].长江科学院院报,1993,10(1):36-43.(CHEN Jin,LAI Yue-qiang. Experimental Study on the Reinforcement Scheme for the Geheyan Gravity Arch Dam on the Qingjiang River by Means of Geomechanical Model[J]. Journal of Yangtze River Scientific Research Institute,1993,10(1):36-43. (in Chinese))
[5] 陈安敏,顾金才,沈 俊,等. 地质力学模型试验技术应用研究[J].岩石力学与工程学报,2004,23(22) :44-48.(CHEN An-min,GU Jin-cai,SHEN Jun,et al.Application Study on the Geomechanical Model Experiment Techniques [J]. Chinese Journal of Rock Mechanics and Engineering,2004, 23(22):44-48. (in Chinese))
[6] 周维垣,杨若琼,刘耀儒,等. 高拱坝整体稳定地质力学模型试验研究[J]. 水力发电学报,2005,24(1):53-58,64. (ZHOU Wei-yuan,YANG Ruo-qiong,LIU Yao-ru,et al. Research on Geomechanical Model of Rupture Tests of Arch Dams for Their Stability[J]. Journal of Hydroelectric Engineering,2005,24(1):53-58,64.(in Chinese))
[7] 姜小兰,陈 进,孙绍文,等. 高拱坝整体稳定问题的试验研究[J].长江科学院院报,2008,25(5):88-93. (JIANG Xiao-lan,CHEN Jin,SUN Shao-wen,et al. Experimental Study on Entire Stability for High Arch Dam[J]. Journal of Yangtze River Scientific Research Institute,2008,25(5):88-93.(in Chinese))
[8] 张 林,刘小强,陈建叶.复杂地质条件下拱坝坝肩稳定地质力学模型试验研究[J].四川大学学报( 工程科学版) ,2004,36(6):1-5. (ZHANG Lin,LIU Xiao-qiang,CHEN Jian-ye. The Geo-mechanical Model Test on Stability of Arch Dam Abutment under Complex Geological Conditions[J].Journal of Sichuan University ( Engineering Science) ,2004,36(6):1-5.(in Chinese))
[9] 姜小兰, 陈 进, 孙绍文. 锦屏工程地质力学模型坝基岩体新材料研究[ J]. 长江科学院院报, 2009, (6):20-22.(JIANG Xiao-lan, CHEN Jin, SUN Shao-wen. Research on New Material of Dam Foundation Rockmass of Geomechanical Model for Jinping Dam[J]. Journal of Yangtze River Scientific Research Institute, 2009, (6):20-22.(in Chinese))
[10]何显松,马洪琪,张 林,等. 地质力学模型试验方法与变温相似模型材料研究[J].岩石力学与工程学报,2009, 28(5):980-986. (HE Xian-song,MA Hong-qi,ZHANG Lin,et al. Study of Test Method of Geomechanical Model and Temperature Analogous Model Material[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(5):980-986. (in Chinese))
[11]姜小兰,陈 进,孙绍文. 锦屏一级高拱坝物理模型试验研究[J].人民长江,2009,40(19):76-78.(JIANG Xiao-lan,CHEN Jin,SUN Shao-wen. Research on Physical Model Test for High Arch Dam of Jinping I Hydropower Station[J]. Yangtze River,2009,40(19):76-78. (in Chinese))
[12]姜小兰,操建国,孙绍文.构皮滩双曲拱坝整体稳定地质力学模型试验研究[J].长江科学院院报,2002,19(6):21-24.(JIANG Xiao-lan, CAO Jian-guo, SUN Shao-wen. Geo-mechanical Model Test on Entire Stability for Goupitan Hyperbolic Arch Dam[J].Journal of Yangtze River Scientific Research Institute,2002,19(6):21-24.(in Chinese))
PDF(2186 KB)

Accesses

Citation

Detail

Sections
Recommended

/