Technique of Quality Inspection for the Underwater PrecastConcrete Slabs Connected with Hinges

ZHAO Gang, HUANG Jun-you, WANG Dong-mei, WANG Mao-mei, ZHU Da-dong

Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (6) : 31-34.

PDF(1415 KB)
PDF(1415 KB)
Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (6) : 31-34. DOI: 10.3969/j.issn.1001-5485.2013.06.008

Technique of Quality Inspection for the Underwater PrecastConcrete Slabs Connected with Hinges

  • ZHAO Gang, HUANG Jun-you, WANG Dong-mei, WANG Mao-mei, ZHU Da-dong
Author information +
History +

Abstract

The precast concrete slab connected with hinges is a new structure of embankment protection, and has been successfully applied to some embankment protection projects. However, since the size of underwater slab is very small, the underwater layout of concrete slab is difficulty to be detected, which brings about difficulty to the appraisal of underwater construction quality. Through analyzing and comparing various underwater inspection techniques, we present the multi-beam echo sounding with ultra high resolution which is applied to the investigation of embankment protection with hinge-connected concrete slabs in Wuhan segment of Yangtze River. This technique is proved to be advantageous in the inspection of underwater precast concrete slabs connected with hinges, and could also be applied to similar underwater engineering.

Key words

precast concrete slab connected with hinges / multi-beam echo sounding / quality / inspection

Cite this article

Download Citations
ZHAO Gang, HUANG Jun-you, WANG Dong-mei, WANG Mao-mei, ZHU Da-dong. Technique of Quality Inspection for the Underwater PrecastConcrete Slabs Connected with Hinges[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(6): 31-34 https://doi.org/10.3969/j.issn.1001-5485.2013.06.008

References

[1]陈 辉,吴 杰 ,赵 钢,等.多波束测深系统在长江沉排护岸工程运行状况监测中的应用[J].长江科学院院报,2009,26(7); 14-16.(CHEN Hui,WU Jie,ZHAO Gang,et al. Application of Multi-beam Echo Sounder in Monitoring Running Conditions of Precast Concrete Slab Connected with Hinges to Protect Yangtze River Embankment[J]. Journal of Yangtze River Scientific Research Institute,2009,26(7); 14-16.(in Chinese)
[2] 李涛章,叶 松,廖小元,等. 铰链混凝土板沉排新技术与施工实践[J]. 人民长江,2002,33(8);26-29.(LI Tao-zhang,YE Song,LIAO Xiao-yuan,et al. The New Technology of Precast Concrete Slab Connected with Hinges and Practice[J].Yangtze River,2002,33(8); 26-29.(in Chinese)
[3] 李成刚,王伟伟,阎 军.传统多波束系统与具有相干特点的多波束系统的研究[J].海洋测绘,2007,27(2);77-80.(LI Cheng-gang,WANG Wei-wei,YAN Jun. Study on Traditional Multi-beam and Interferometric Multi-beam[J]. Hydrographic Surveying and Charting,2007,27 (2);77-80.(in Chinese)
PDF(1415 KB)

Accesses

Citation

Detail

Sections
Recommended

/