The strengthening grouting of Danjiangkou dam heightening project requires great effort because it is carried out in conditions of reservoir high water head, developed micro-fissures and multiple groutings. In order to explore an economic and effective grouting method, current methods of curtain grouting in the presence of high water head are analyzed. On this basis, a detailed introduction of compound grouting test design, key construction technologies and inspection after grouting is given. The test results are analyzed in terms of pressurized water data, acoustic wave test, and fatigue pressurized water. Results reveal that cement-chemical compound grouting is effective, saves investment and shortens construction period. It is a good example for other engineering design and construction for curtain grouting under high head.
Key words
Danjiangkou project /
high water head /
compound grouting
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 蔡汉生,王 利. 江垭大坝坝基防渗帷幕缺陷及其处理[J]. 水利水电快报, 2002,23(10):15-16. (CAI Hai-sheng, WANG Li. Curtain Grouting Defects and Their Treatment in Jiangya Dam Foundation [J]. Express Water Resources & Hydropower Information,2002,23(10):15-16.(in Chinese))
[2] 许明显,沈自力. 高水头条件下进行坝基帷幕灌浆处理的工程实践[J]. 浙江水利科技,2003,(1):76-77. (XU Ming-xian, SHEN Zi-li. The Engineering Practice of Dam Foundation Treatment on Curtain Grouting under High Water Head[J]. Zhejiang Hydrotechnics,2003,(1):76-77.(in Chinese))
[3] 陈 昊,董建军,谭日升. 湿磨细水泥-化学复合灌浆在三峡工程基础处理中的应用研究[J]. 长江科学院报,2006,23(4):64-66. (CHEN Hao, DONG Jian-jun, TAN Ri-sheng. Study on Fine Ground Cement and Chemical Compound Grouting for Foundation Treatment of TGP[J]. Journal of Yangtze River Scientific Research Institute,2006,23(4):64-66. (in Chinese))
[4] 邢林生. 陈村大坝补强加固工程取得良好效果[J]. 水利水电技术,1994,(1):60-63. (XING Lin-sheng. The Good Effect of Reinforcement Engineering at Chencun Dam[J]. Water Resources and Hydropower Engineering, 1994, (1): 60-63. (in Chinese))