Optimization of Temperature Control Measures for an RCC Gravity Dam

QIAN Bo, SONG Ming-ming

Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (10) : 87-93.

PDF(1657 KB)
PDF(1657 KB)
Journal of Changjiang River Scientific Research Institute ›› 2013, Vol. 30 ›› Issue (10) : 87-93.
HYDRAULIC STRUCTURE AND MATERIAL

Optimization of Temperature Control Measures for an RCC Gravity Dam

  • QIAN Bo1, SONG Ming-ming2
Author information +
History +

Abstract

Crack of RCC gravity dam is caused directly by thermal stress. It can be mainly prevented by temperature control, construction measures and structure optimization of the dam. A typical overflow dam section of a hydroproject is taken as an example. On the basis of boundary value conditions and thermodynamic parameters of the concrete of each dam zone, the standard of temperature control for the dam body is determined by calculating the stable temperature field, foundation temperature difference, temperature difference between layers and the temperature difference between the interior and exterior of dam body. In line with the temperature control standard, finite element method is employed to conduct sensitivity analysis on some factors such as surface thermal insulation, concrete placing temperature, cooling of water pipes, design of longitudinal structure joints, placing time and lift height. In consequence, measures of temperature control are optimized. The analysis shows that the temperature control measures can meet the requirement of the temperature and stress field of the dam, and ensure the continuous concrete placement. This research provides scientific basis for dam concrete construction.

Key words

roller compacted concrete(RCC) / gravity dam / temperature control measures / crack prevention / sensitivity analysis

Cite this article

Download Citations
QIAN Bo, SONG Ming-ming. Optimization of Temperature Control Measures for an RCC Gravity Dam[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(10): 87-93

References

[1] 朱振泱,强 晟,王海波,等.冬季浇筑碾压混凝土坝温控防裂研究[J].水电能源科学,2011,29(1):45-47.(ZHU Zhen-yang, QIANG Sheng, WANG Hai-bo, et al. Study on Temperature Control and Cracking Prevention of Winter Concreting RCC Gravity Dam[J]. Water Resources and Power, 2011, 29(1):45-47.(in Chinese)
[2] 张国新. 碾压混凝土坝的温度控制[J].水利水电技术,2007,38(6):41-46.(ZHANG Guo-xin. Temperature Control of Roller Compacted Concrete Dam[J]. Water Resource and Hydropower Engineering, 2007, 38(6): 41-46.(in Chinese)
[3] 冯树荣.高碾压混凝土重力坝温控防裂技术研究进展[J].水利水电科技进展,2009,29(1):77-80.(FENG Shu-rong. Study on Temperature Control and Crack Prevention Technology of a High RCC Gravity Dam[J]. Advances in Science and Technology of Water Resources, 2009, 29(1): 77-80.(in Chinese)
[4] 朱伯芳.大体积混凝土温度应力与温度控制[M].北京:中国电力出版社,1998.(ZHU Bo-fang. Thermal Stresses and Temperature of Mass Concrete [M]. Beijing: China Electric Power Press,1998.(in Chinese)
[5] 朱伯芳,许 平.混凝土坝仿真计算的并层算法和分区异步长算法[J].水力发电,1996,22(1):38-43.(ZHU Bo-fang, XU Ping. Zone-Merged Algorithm and Zoned Different-Step-Length Algorithm in the Concrete Simulation Calculation[J]. Water Power, 1996, 22(1): 38-43.(in Chinese)
[6] 朱伯芳.考虑外界温度影响的水管冷却等效热传导方程[J].水利学报,2003,(3):49-54.(ZHU Bo-fang. The Equivalent Heat Conduction Equation of Pipe Cooling in Mass Concrete Considering Influence of External Temperature[J]. Journal of Hydraulic Engineering, 2003, (3): 49-54.(in Chinese)
[7] 唐欣薇,李鹏辉,张楚汉.碾压混凝土坝温度场与应力场全过程仿真分析[J].长江科学院院报,2007,24(3):50-53. (TANG Xin-wei, LI Peng-hui, ZHANG Chu-han. Entire Process Simulation of Temperature and Stress Fields for RCC Dams[J]. Journal of Yangtze River Scientific Research Institute, 2007, 24(3): 50-53.(in Chinese)
[8] 马志远.碾压混凝土重力坝施工温度控制问题研究[D].郑州:郑州大学,2009.(MA Zhi-yuan. Research on Construction Temperature Control for RCC Gravity Dam[D]. Zhengzhou: Zhengzhou University, 2009.(in Chinese)
[9] 蒋胜祥.高气温地区碾压混凝土重力坝温控防裂方法研究[D].南京:河海大学,2007.(JIANG Sheng-xiang. Research on Method of Temperature Control and Cracking Prevention for RCC Gravity Dam in High Temperature Areas[D]. Nanjing: Hohai University, 2007.(in Chinese)
[10]张 琼,乐金朝,徐向东. 碾压混凝土重力坝有保温层的温控计算[J].人民黄河,2010,32(1):89-90.(ZHANG Qiong, LE Jin-chao, XU Xiang-dong. Temperature Control Calculation of Rolled Concrete Gravity Dam with an Insulating Layer[J]. Yellow River, 2010, 32(1): 89-90.(in Chinese)
[11]DL5108—1999,混凝土重力坝设计规范[S].北京:中国电力出版社,1999.(DL5108—1999, Standards for Design of Concrete Gravity Dam[S]. Beijing: China Electric Power Press, 1999.(in Chinese)
[12]宁 钟,李 翼.龙滩大坝碾压混凝土高温季节施工的温控措施[J].水力发电,2006,32(9):50-53.(NING Zhong, LI Yi. Temperature Control Measures for RCC Construction of Longtan Dam under Hot Season[J]. Water Power, 2006, 32(9): 50-53.(in Chinese)
[13]朱岳明,徐之青,贺金仁,等.混凝土水管冷却温度场的计算方法[J].长江科学院院报,2003,20(2):19-22. (ZHU Yue-ming, XU Zhi-qing, HE Jin-ren, et al. A Calculation Method for Solving Temperature Field of Mass Concrete with Cooling Pipes[J]. Journal of Yangtze River Scientific Research Institute, 2003, 20(2): 19-22.(in Chinese)
[14]隋学明,方朝阳.金安桥水电站碾压混凝土快速施工的温控措施研究[J].水电能源科学,2007,25(2):46-49,118.(SUI Xue-ming, FANG Chao-yang. Study on Temperature Control Measures of Rolled Concrete Accelerated Construction of Jinanqiao Hydroelectric Station[J]. Water Resources and Power, 2007, 25(2): 46-49, 118.(in Chinese)
PDF(1657 KB)