Short-Term Optimal Scheduling of Songjianghe Cascade Hydropower Stations Based on Mathematical Modeling

FENG Yan-Min, ZHANG Xue-Yuan, LIANG Nian-Sheng

Journal of Changjiang River Scientific Research Institute ›› 2012, Vol. 29 ›› Issue (4) : 1-6.

PDF(960 KB)
PDF(960 KB)
Journal of Changjiang River Scientific Research Institute ›› 2012, Vol. 29 ›› Issue (4) : 1-6.
WATER RESOURCES AND ENVIRONMENT

Short-Term Optimal Scheduling of Songjianghe Cascade Hydropower Stations Based on Mathematical Modeling

  •  FENG  Yan-Min1, ZHANG  Xue-Yuan2, LIANG  Nian-Sheng3
Author information +
History +

Abstract

Improved Particle Swarm Optimization (PSO) is applied to solving the short-term optimal scheduling of Songjianghe cascade hydropower stations. Two mathematic models characterized respectively by maximum  power generation and maximum  generation profit are established. Shrinkage factor and hereditary mutation operator are adopted to overcome the shortcomings of standard PSO like precocity and slow convergence in late stage. These  mathematical models are employed in the optimal scheduling analysis for Songjianghe cascade power stations, and the results show that the quality and benefit of the stations could be improved by short-term optimal scheduling. Both the calculation time and accuracy by applying the improved PSO are satisfactory.

Key words

Songjianghe cascade hydropower stations / short-term optimal scheduling / Particle Swarm Optimization / model of maximum generation profit

Cite this article

Download Citations
FENG Yan-Min, ZHANG Xue-Yuan, LIANG Nian-Sheng. Short-Term Optimal Scheduling of Songjianghe Cascade Hydropower Stations Based on Mathematical Modeling[J]. Journal of Changjiang River Scientific Research Institute. 2012, 29(4): 1-6
PDF(960 KB)

Accesses

Citation

Detail

Sections
Recommended

/