JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2011, Vol. 28 ›› Issue (2): 45-49.

• HEALTHY CHANGJIANG RIVER • Previous Articles     Next Articles

Analysis on Crack Causes of High Rock Slope

CUI Hua-li , FEI Wen-ping , ZHANG Guo-qiang   

  1. State Key Laboratory of Hydraulics and Mountain River Engineering , College of Water Resources  and Hydropower , Sichuan University , Sichuan 610065 , Ch
  • Online:2011-02-01 Published:2012-09-26

Abstract: The stability of high rock slope has a direct impact on the smooth construction of a hydropower station. Due to large unloading depth and developed dikes, faults and fissures, as well as large-scale excavation, a large number of cracks occurred in the excavation of the right bank slope of a hydropower station in southwest China, which would produce unfavorable influences on the subsequent construction and the stability during operation period. Based on the cracks of high rock slope and according to the geological data, monitoring results and construction conditions, the causes of cracks are analyzed comprehensively and the corresponding engineering treatment measures are suggested, which may provide references for the exploration, monitoring and engineering treatment of similar projects.

Key words: rock slope ,    causes of crack  ,   safety monitoring

CLC Number: