Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant

LIU Dun-huang , JIANG Yao-zu , JIN Feng

Journal of Changjiang River Scientific Research Institute ›› 2010, Vol. 27 ›› Issue (6) : 23-25.

PDF(825 KB)
PDF(825 KB)
Journal of Changjiang River Scientific Research Institute ›› 2010, Vol. 27 ›› Issue (6) : 23-25.
HEALTHY CHANGJIANG RIVER

Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant

  • LIU Dun-huang , JIANG Yao-zu , JIN Feng
Author information +
History +

Abstract

 Aiming at the problem of the abrasion at the bottom sill of emergency gate of desilting outlet of Gezhouba Power Plant, we recorded the flow state of the generator set inlet and the movement of sediment and gravels in the sediment-flushing inlet while the generator sets were running by the underwater photography. By observation, the character of the flow and the law of the sediment movement were gotten, the influencing factors of the abrasion at the bottom sill were analyzed, and some basic measures for avoiding abrasion were given.

Key words

 Gezhouba Power Plant  / the sediment-flushing outlet  / abrasion  / cause analysis  / measures for avoiding abrasion

Cite this article

Download Citations
LIU Dun-huang , JIANG Yao-zu , JIN Feng. Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant[J]. Journal of Changjiang River Scientific Research Institute. 2010, 27(6): 23-25