Resistance Monitoring in Construction of Caisson Foundation ofCofferdam of Xiangjiaba Hydropower Station

XU Tao, LI Yang, WU Min-Wu, LIU Jiang-Lei

Journal of Changjiang River Scientific Research Institute ›› 2009, Vol. 26 ›› Issue (8) : 92-94.

PDF(1094 KB)
PDF(1094 KB)
Journal of Changjiang River Scientific Research Institute ›› 2009, Vol. 26 ›› Issue (8) : 92-94.
.

Resistance Monitoring in Construction of Caisson Foundation ofCofferdam of Xiangjiaba Hydropower Station

  •  XU  Tao, LI  Yang, WU  Min-Wu, LIU  Jiang-Lei
Author information +
History +

Abstract

In the sinking process of caissons of cofferdam of the Xiangjiaba Hydropower Station, the side friction and the end bearing pressure of caissons were monitored. According to the observed data, the resistance character pressure systematically was studied during the sinking, and the distribution of wall side friction and end bearing force during penetrating into different soil strata were obtained. And meanwhile, the formula of sinking coefficient KS was proposed, and from observed data, when the KS was less than 1.15 during threetime sinking, the caisson reached designed location to be difficult.

Cite this article

Download Citations
XU Tao, LI Yang, WU Min-Wu, LIU Jiang-Lei. Resistance Monitoring in Construction of Caisson Foundation ofCofferdam of Xiangjiaba Hydropower Station[J]. Journal of Changjiang River Scientific Research Institute. 2009, 26(8): 92-94
PDF(1094 KB)

Accesses

Citation

Detail

Sections
Recommended

/