JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2009, Vol. 26 ›› Issue (12): 50-53.

• . • Previous Articles     Next Articles

Study on Experiment of River Closure of Dagang Mountain Hydropower Station Project

 WANG  Ji-Bao, GUO  Hong-Min   

  • Online:2009-12-01 Published:2012-07-05

Abstract: By eight river closure scheme tests about Dagang Mountain Hydropower Station Project, the flow characteristics of closure-gap during the closure was analyzed, the equivalent diameter of dumped ripraps and reasonable intensity of dumping in the different closure-gap widths were decided. The closure result shows that the single-dike bidirection end dumping closure is feasible, successful, which provides a scientific basis for implementation of closure work.