Key Technology Problems of Seepage Control for Building High Concrete Face Rockfill Dam

XIE Ding-Song, LIU Jie, WEI Ying-Qi

Journal of Changjiang River Scientific Research Institute ›› 2009, Vol. 26 ›› Issue (10) : 118-121.

PDF(1000 KB)
PDF(1000 KB)
Journal of Changjiang River Scientific Research Institute ›› 2009, Vol. 26 ›› Issue (10) : 118-121.
.

Key Technology Problems of Seepage Control for Building High Concrete Face Rockfill Dam

  •  XIE  Ding-Song, LIU  Jie, WEI  Ying-Qi
Author information +
History +

Abstract

The development of concrete face rockfill dam(CFRD) is rapid,but there are some technical problems to be still researched for building 300 m grade concrete face rockfill dam. On the basis of the behavior of three CFRDs in China and Campos Novos CFRD in Brazil, the authors put forward three questions to need to be solved now on seepage control: first,segregation between face slab and bedding layer;second, the optimization design of material of bedding layer;third, the drainage design problemes of the CFRD. Finally, the corresponding research ways are proposed.

Cite this article

Download Citations
XIE Ding-Song, LIU Jie, WEI Ying-Qi. Key Technology Problems of Seepage Control for Building High Concrete Face Rockfill Dam[J]. Journal of Changjiang River Scientific Research Institute. 2009, 26(10): 118-121
PDF(1000 KB)

Accesses

Citation

Detail

Sections
Recommended

/