Geological Research on Selection of Buried Depth of Arc Abutment of Wudongde High Concrete Arc Dam

LI Hui-Zhong, XIANG Jia-Bo, WANG Tuan-Le, WENG Jin-Wang, HUANG Hua, HAO Wen-Zhong, YI Xing-Chen, LIU Zhen-Hua

Journal of Changjiang River Scientific Research Institute ›› 2008, Vol. 25 ›› Issue (5) : 98-102.

PDF(389 KB)
PDF(389 KB)
Journal of Changjiang River Scientific Research Institute ›› 2008, Vol. 25 ›› Issue (5) : 98-102.
.

Geological Research on Selection of Buried Depth of Arc Abutment of Wudongde High Concrete Arc Dam

  • LI  Hui-Zhong, XIANG  Jia-Bo, WANG  Tuan-Le, WENG  Jin-Wang, HUANG  Hua, HAO  Wen-Zhong, YI  Xing-Chen, LIU  Zhen-Hua
Author information +
History +

Abstract

One of the important geological investigation and research for arc dam is how to select the properly buried depth of the arc abutment. The paper points out that the rock mass unloading degree is one major factor which influences the rock mass quality on the basis of analyzing the geological conditions of the dam site area. Meanwhile the paper describes the rock mass relief features of the both side banks of the valley. The slightly relief load rock mass and no-relief load rock mass can act as the available rock mass for arc abutment. The relief rock mass zones on both sides of the valley are classified according to the results of combining the geological investigation with, seismic prospecting and acoustic prospecting in the adit. Then the properly buried depth of the arc abutment is suggested for designing the high arc dam.

Cite this article

Download Citations
LI Hui-Zhong, XIANG Jia-Bo, WANG Tuan-Le, WENG Jin-Wang, HUANG Hua, HAO Wen-Zhong, YI Xing-Chen, LIU Zhen-Hua. Geological Research on Selection of Buried Depth of Arc Abutment of Wudongde High Concrete Arc Dam[J]. Journal of Changjiang River Scientific Research Institute. 2008, 25(5): 98-102
PDF(389 KB)

Accesses

Citation

Detail

Sections
Recommended

/