Three Dimensional Back Analysis on Leftbank Intake Slope ofLongtan Hydropower Station

ZHU Ze-Qi, SHENG Qian, ZHANG Yong-Hui, LENG Xian-Lun

Journal of Changjiang River Scientific Research Institute ›› 2008, Vol. 25 ›› Issue (2) : 33-37.

PDF(436 KB)
PDF(436 KB)
Journal of Changjiang River Scientific Research Institute ›› 2008, Vol. 25 ›› Issue (2) : 33-37.
.

Three Dimensional Back Analysis on Leftbank Intake Slope ofLongtan Hydropower Station

  •  ZHU  Ze-Qi, SHENG  Qian, ZHANG  Yong-Hui, LENG  Xian-Lun
Author information +
History +

Abstract

On the basis of the finite difference method considering the effect of excavation unloading, one back analysis model of mechanical parameters is established by using orthogonal design theory, neural network and genetical gorithm, and the relative mechanical parameters of the left bank intake slope of Longtan Hydropower Project are back analyzed. The n, the excavation process of construction of the intake slope is simulated by fast Lagrangian analysis of continuance in 3 dimensions (FLAC3D). The deformation pattern and stress state caused by excavation at section 11 of left bank slope are studied, and the slope stability is evaluated comprehensively.

Cite this article

Download Citations
ZHU Ze-Qi, SHENG Qian, ZHANG Yong-Hui, LENG Xian-Lun. Three Dimensional Back Analysis on Leftbank Intake Slope ofLongtan Hydropower Station[J]. Journal of Changjiang River Scientific Research Institute. 2008, 25(2): 33-37
PDF(436 KB)

Accesses

Citation

Detail

Sections
Recommended

/