Analysis on Working Status of Drainage Hole Filters insideGezhouba Project Foundation

DING Pei-Zhong, ZHANG Wei, YUAN Yao-Yu

Journal of Changjiang River Scientific Research Institute ›› 2007, Vol. 24 ›› Issue (5) : 84-86.

PDF(182 KB)
PDF(182 KB)
Journal of Changjiang River Scientific Research Institute ›› 2007, Vol. 24 ›› Issue (5) : 84-86.
.

Analysis on Working Status of Drainage Hole Filters insideGezhouba Project Foundation

  •  DING  Pei-Zhong, ZHANG  Wei, YUAN  Yao-Yu
Author information +
History +

Abstract

The drainage hole filters inside Gezhouba Project foundation have been operated for over 25 years. Their working statuses are analysed based on the monitored results. The filters are in good working order. The assembly filters can still satisfy the engineering demands after working for 25 years.

Cite this article

Download Citations
DING Pei-Zhong, ZHANG Wei, YUAN Yao-Yu. Analysis on Working Status of Drainage Hole Filters insideGezhouba Project Foundation[J]. Journal of Changjiang River Scientific Research Institute. 2007, 24(5): 84-86
PDF(182 KB)

Accesses

Citation

Detail

Sections
Recommended

/