JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2007, Vol. 24 ›› Issue (5): 84-86.
• . • Previous Articles
DING Pei-Zhong, ZHANG Wei, YUAN Yao-Yu
Online:
Published:
Abstract: The drainage hole filters inside Gezhouba Project foundation have been operated for over 25 years. Their working statuses are analysed based on the monitored results. The filters are in good working order. The assembly filters can still satisfy the engineering demands after working for 25 years.
DING Pei-Zhong, ZHANG Wei, YUAN Yao-Yu. Analysis on Working Status of Drainage Hole Filters insideGezhouba Project Foundation[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2007, 24(5): 84-86.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2007/V24/I5/84