Seepage Monitoring Analysis and Safety Assessment for Yatang Dam

LIU Ming, ZHONG Jing-Quan, RAO Xi-Bao, LIU Jia, WANG Wen-Jin

Journal of Changjiang River Scientific Research Institute ›› 2007, Vol. 24 ›› Issue (2) : 30-33.

PDF(326 KB)
PDF(326 KB)
Journal of Changjiang River Scientific Research Institute ›› 2007, Vol. 24 ›› Issue (2) : 30-33.
.

Seepage Monitoring Analysis and Safety Assessment for Yatang Dam

  •  LIU  Ming, ZHONG  Jing-Quan, RAO  Xi-Bao, LIU  Jia, WANG  Wen-Jin
Author information +
History +

Abstract

After the main project of Yatang reservoir was finished, much water seepage had appeared on the foot of the dam downstream slope. As for the phenomena, the seepage monitoring was conducted after the first two-tim es of water impoundment. Based on the monitoring data, the seepage position and harm degree have been thoroughly analyzed, and a preliminary forecast and safety assessment made in the paper.

Cite this article

Download Citations
LIU Ming, ZHONG Jing-Quan, RAO Xi-Bao, LIU Jia, WANG Wen-Jin. Seepage Monitoring Analysis and Safety Assessment for Yatang Dam[J]. Journal of Changjiang River Scientific Research Institute. 2007, 24(2): 30-33
PDF(326 KB)

Accesses

Citation

Detail

Sections
Recommended

/