JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2006, Vol. 23 ›› Issue (4): 56-59.
• . • Previous Articles Next Articles
HUANG Zhi-Peng, ZHOU Jiang-Ping
Online:
Published:
Abstract: This paper introduces geology status and safety monit oring design of the left diversion tunnel in construction of Jinping - 1 Hydropower Project simply, expatiates on the results of safety monitoring in construction, and analyzes the rules and characters of stress and deformation of surrounding rock. Now the diversion tunnel has been completed, the changes of deformation and anchor stress for surrounding rock are small. This result shows that the surrounding rock is stable, safety monitoring result can provide reliable basis for design and construction.
HUANG Zhi-Peng, ZHOU Jiang-Ping. Analyses of Safety Monitoring and Host Rock Stability for Left Diversion Tunnel in Construction of Jinping -1 Hydropower Project[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2006, 23(4): 56-59.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2006/V23/I4/56