JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2005, Vol. 22 ›› Issue (4): 80-83.

• . • Previous Articles     Next Articles

Projection Pursuit Method for Optimizing Water Resources Project Schemes

 XUE  Cang-Sheng, JIN  Ju-Liang, WEI  Yi-Ming   

  • Online:2005-08-01 Published:2012-03-05

Abstract: In order to solve the important problems occurring inoptimizing water resources engineering schemes, such as consistency and non - dimensionalization of fuzzy qualitative and quantitative evaluation indexes, difficulty in determining weights of indexes, little difference of comprehensive evaluation index values and notable subjective influence on optimized results, a projection pursuit method is developed, named FPRM - PP(fuzzy preferential relation matrix - projection prusuit). An optimal fuzzy consistency judgement matrix A, consistency index function and its critical values are presented. A new algorithm is proposed to check and modify the consistency of matrix A and to compute the preferential values of each scheme at the same time using accelerating genetic algorithm improved by the authors. The results from theoretical analysis and a case study show that: FPRM - PP is visual, practical; modificative range of matrix is less; its result is stable and of high precision. 