Analysis on optimum selection of dike-lineof bank protection works in Three Gorges Reservoir

TONG Hai-Hong, YAN Guo-Hong, ZHAN Zhi-Min

Journal of Changjiang River Scientific Research Institute ›› 2002, Vol. 19 ›› Issue (4) : 42-44.

PDF(140 KB)
PDF(140 KB)
Journal of Changjiang River Scientific Research Institute ›› 2002, Vol. 19 ›› Issue (4) : 42-44.
.

Analysis on optimum selection of dike-lineof bank protection works in Three Gorges Reservoir

  •  TONG  Hai-Hong, YAN  Guo-Hong, ZHAN  Zhi-Min
Author information +
History +

Abstract

With its unique geographic site, the bank protectionworks in the There Gorges reservoir area were more complex than other projects.By using fuzzy comprehensive evaluation, the dike-line selection was analyzed quantitily, some special evaluation factors were proposed and their subordinate functions and rules also presented. Reservoir capacity of the Three Gorges Projects is regarded as the important judging factor in calculation of weight, so this provides a quantity analysis tool, which can help engineers make decision for the bank protection works in the TGP reservoir area.

Cite this article

Download Citations
TONG Hai-Hong, YAN Guo-Hong, ZHAN Zhi-Min. Analysis on optimum selection of dike-lineof bank protection works in Three Gorges Reservoir[J]. Journal of Changjiang River Scientific Research Institute. 2002, 19(4): 42-44
PDF(140 KB)

Accesses

Citation

Detail

Sections
Recommended

/