JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2002, Vol. 19 ›› Issue (3): 25-28.
• . • Previous Articles Next Articles
LI Xue-Hong, GU Chong-Shi, ZHOU Xiao-Xian
Online:
Published:
Abstract: Aiming at the over-size of lateral displacement of buttress No.3 and buttress No.12 in Meishan multiple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, and structural calculation were applied to analyze the cause quantitatively from the topography and the structure of dam body.It can be concluded that the over-size of lateral displacement of buttress No.3 and buttress No.12 is the results of interaction of temperature load, the topography and the structure of dam body.
LI Xue-Hong, GU Chong-Shi, ZHOU Xiao-Xian. Cause analysis on oversize of lateral displacement of buttresses No.3 and No.12 in Meishan multiple arch dam[J]. JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI, 2002, 19(3): 25-28.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://ckyyb.crsri.cn/EN/
http://ckyyb.crsri.cn/EN/Y2002/V19/I3/25