Optimization on instrument arrangement ofsafety monitoring system of TGP

WANG De-Hou, LIU Jing-Xi, HUA Xi-Sheng

Journal of Changjiang River Scientific Research Institute ›› 2001, Vol. 18 ›› Issue (5) : 73-75.

PDF(140 KB)
PDF(140 KB)
Journal of Changjiang River Scientific Research Institute ›› 2001, Vol. 18 ›› Issue (5) : 73-75.
.

Optimization on instrument arrangement ofsafety monitoring system of TGP

  •  WANG  De-Hou, LIU  Jing-Xi, HUA  Xi-Sheng
Author information +
History +

Abstract

The scale of the Three Gorges Project's(TGP's) safety monitoring system is enormous and its tech nology complex.On the basis of primary design,it is necessary to develop optimum research for this system.Based on the general principle of monitoring arrangement of "laying emphasis on key points,considering overall situation,uniting planning and implementing plan by stages",aiming at the features of the different structures and their foundations,taking the deformation monitoring,seepage monitoring,stress monitoring and temperature monitoring as key points,the optimum objectives were determined,researched and good results obtained.Among them,the number of instruments used for deformation monitoring and seepage monitoring,as well as those used for hydraulics monitoring and dynamic monitoring,may be reduccd by about 1/2,and those used for stress monitoring and temperature monitoring,by about 2/3.Most of the study results were adopted in the tender design and construction detail drawing.

Cite this article

Download Citations
WANG De-Hou, LIU Jing-Xi, HUA Xi-Sheng. Optimization on instrument arrangement ofsafety monitoring system of TGP[J]. Journal of Changjiang River Scientific Research Institute. 2001, 18(5): 73-75
PDF(140 KB)

Accesses

Citation

Detail

Sections
Recommended

/