JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2001, Vol. 18 ›› Issue (4): 7-8.

• . • Previous Articles     Next Articles

An understanding of difficulty and its countermeasures\=

 BAI  Lin, GUO  Hong-Min, LIU  Li-Zhong   

  1. An understanding of difficulty and its countermeasures\=  
  • Online:2001-08-01 Published:2012-03-05

Abstract: Through the practices of the end dumping closure projects,it is recognized thatthe main hydraulic factors,which affect the difficulty in end dumping closure,are
closure drop Z,discharge Q and water depth h.This paper introduces the main measures to lower these three factors on the basis of the end dumping closure in the Gezhouba Project,Three Gorges Project etc..