Determining the Comprehensive Deformation Modulus of Foundation after High Dam Constructed

LI Pan-feng, CUI Chang-wu, CHEN Kui, ZhANG Shao-cheng

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (11) : 17-21.

PDF(1396 KB)
PDF(1396 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (11) : 17-21. DOI: 10.3969/j.issn.1001-5485.2014.11.0042014,31(11):17-21
CHARACTERISTICS AND TESTS OF ROCK MECHANICS

Determining the Comprehensive Deformation Modulus of Foundation after High Dam Constructed

  • LI Pan-feng1,2, CUI Chang-wu1,2, CHEN Kui1,2, ZhANG Shao-cheng1,2
Author information +
History +

Abstract

The engineering properties of high arch dam’s foundation rock change inevitably after excavation unloading, consolidation grouting and dam loading. The comprehensive deformation modulus of foundation rock mass is an important index for safety assessment and feedback analysis, but it cannot be obtained by field test. To solve this problem, we conducted researches on the geological condition, deformation test, borehole elastic modulus, and the relation between deformation modulus E0 and longitudinal wave velocity Vp with Xiluodu hydropower station as an example. On this basis, we put forward a method of determining the comprehensive deformation modulus of foundation rock mass after the completion of high arch dam construction. The comprehensive deformation modulus of Xiluodu high arch dam foundation after construction completed is between 11-14 MPa. This parameter was used for 3-D numerical simulation, and the simulated deformation was in consistency with monitored deformation, which verified this method is appropriate.

Key words

high arch dam / dam foundation / comprehensive deformation modulus / determination of deformation modulus / Xiluodu hydropower station

Cite this article

Download Citations
LI Pan-feng, CUI Chang-wu, CHEN Kui, ZhANG Shao-cheng. Determining the Comprehensive Deformation Modulus of Foundation after High Dam Constructed[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(11): 17-21 https://doi.org/10.3969/j.issn.1001-5485.2014.11.0042014,31(11):17-21

References

[1] 石安池,唐鸣发,周其健. 金沙江白鹤滩水电站柱状节理玄武岩岩体变形特性研究.岩石力学与工程学报,2008,27(10):2079-2086.(SHI An-chi,TANG Ming-fa,ZHOU Qi-jian. Research of Deformation Characteristics of Columnar Jointed Basalt at Baihetan Hydropower Station on Jinsha River. Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2079-2086. (in Chinese))
[2] 黄国明,黄润秋. 某坝址玄武岩岩体强度和变形特性.长江科学院院报,1998,15(6):19-22.(HUANG Guo-ming, HUANG Run-qiu. Strength and Deformation Properties of Basaltic Rock Masses. Journal of Yangtze River Scientific Research Institute, 1998,15(6):19-22. (in Chinese))
[3] 熊诗湖, 邬爱清, 周火明. 层状软岩力学特性现场试验研究. 地下空间与工程学报,2006,2(6):887-891.(XIONG Shi-hu, WU Ai-qing, ZHOU Huo-ming. In-Situ Test on Mechanical Characteristics of Soft Layer Rock Mass. Chinese Journal o f Underground Space and Engineering,2006,2(6):887-891. (in Chinese))
[4] 罗超文,李海波,马 鹏. 刚性钻孔弹模计在白鹤滩电站坝基岩体变形参数测定中的应用. 长江科学院院报,2012,29(8):76-82.(LUO Chao-wen,LI Hai-bo,MA Peng. Application of Borehole Jack in Deformation Modulus Measurement of Rock Mass in the Foundation of Baihetan Hydropower Station. Journal of Yangtze River Scientific Research Institute,2012,29(8):76-82. (in Chinese))
[5] 张志刚,乔春生. 改进的节理岩体变形模量经验确定方法及其工程应用.工程地质学报,2006,14(2):233-238.(ZHANG Zhi-gang,QIAO Chun-sheng. Improved Empirical Method for Determination of Deformation Modulus of Jointed Rock Masses and Its Application in Engineering. Journal of Engineering Geology,2006, 14(2):233-238. (in Chinese))
[6] 卢书强,许 模 . 基于 GSI 系统的岩体变形模量取值及应用. 岩石力学与工程学报,2009,28(增刊1):2736-2742.(LU Shu-qiang,XU Mo. Determination and Application of Modulus of Deformation of Rock Masses Based on GSI System. Chinese Journal of Rock Mechanics and Engineering , 2009,28(Sup.1):2736-2742. (in Chinese))
[7] 刘 健,练继建. 李家峡拱坝坝体弹性模量及基岩变形模量的反演. 岩石力学与工程学报,2005,24(24):4466-4471. (LIU Jian,LIAN Ji-jian. Back Analysis of Elastic Modulus of Lijiaxia Arch Concrete Dam and Deformation Modulus of Its Foundation. Chinese Journal of Rock Mechanics and Engineering , 2005,24(24):4466-4471. (in Chinese))
[8] 李维树,黄志鹏,谭 新.水电工程岩体变形模量与波速相关性研究及应用. 岩石力学与工程学报,2010,29(增刊1):2727-2733. (LI Wei-shu,HUANG Zhi-peng,TAN Xin. Research and Application of Correlation Between Deformation Modulus and Wave Velocity of Rock Mass in Hydroelectric Project. Chinese Journal of Rock Mechanics and Engineering ,2010,29(Sup.1):2727-2733. (in Chinese))
[9] 宋彦辉,巨广宏,孙 苗. 岩体波速与坝基岩体变形模量关系.岩土力学,2011,32(5):1507-1512.(SONG Yan-hui, JU Guang-hong, SUN Miao. Relationship between Wave Velocity and Deformation Modulus of Rock Masses. Rock and Soil Mechanics,2011,32(5):1507-1512.(in Chinese))
[10] 樊启祥,周绍武,李炳锋. 溪洛渡特高拱坝建设的岩石工程关键技术. 岩石力学与工程学报,2012,31(10):1998-2014.(FAN Qi-xiang,ZHOU Shao-wu,LI Bing-feng. Key Technologies of Rock Engineering for Construction of Xiluodu Superhigh Arch Dam. Chinese Journal of Rock Mechanics and Engineering , 2012,31(10):1998-2014.(in Chinese))
PDF(1396 KB)

Accesses

Citation

Detail

Sections
Recommended

/