Fluvial Process and Riverbed Protection at Key Points inthe Downstream River of the Three Gorges Project

NIU Lan-hua, LI Yun-zhong, DU Lin-xia

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (6) : 123-129.

PDF(1984 KB)
PDF(1984 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (6) : 123-129. DOI: 10.3969/j.issn.1001-5485.2014.06.0232014, 31(06):123-129

Fluvial Process and Riverbed Protection at Key Points inthe Downstream River of the Three Gorges Project

  • NIU Lan-hua, LI Yun-zhong, DU Lin-xia
Author information +
History +

Abstract

In the present paper, we analyzed the fluvial process and the effect of riverbed protection of key points in the downstream of Three Gorges Project. In line with the characteristics of low water level at Yichang station, we selected Yanzhiba, Nanyangji and Lujiahe as the key points for controlling, and analyzed their fluvial processes as well as their impact on the water level at Yichang station based on prototype observation. Moreover, we carried out long-term monitoring on the effect of riverbed protection at Yanzhiba. Results reveal that measures including blocking deep groove by dumping stones and protection with geosynthetics mattress with concrete block has apparent effect of protection and anti-erosion for riverbed, and at the same time roughens the riverbed for backwater effect, which somehow restrains the water level decreasing at Yichang station.

Key words

river reach downstream of dam / fluvial process of key points / water-level decreasing / riverbed protection project

Cite this article

Download Citations
NIU Lan-hua, LI Yun-zhong, DU Lin-xia. Fluvial Process and Riverbed Protection at Key Points inthe Downstream River of the Three Gorges Project[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(6): 123-129 https://doi.org/10.3969/j.issn.1001-5485.2014.06.0232014, 31(06):123-129

References

[1] 李云中.长江宜昌河段低水位变化研究[J].中国三峡建设, 2002, (5):12-14.(LI Yun-zhong. Variation of Low Water Level in Yichang Reach of the Yangtze River[J]. China Three Gorges Construction, 2002, (5):12-14. (in Chinese))
[2] 牛兰花, 李云中, 成金海, 等.葛洲坝下游胭脂坝河床护底工程效果分析[J].人民长江, 2012, (11):102-105. (NIU Lan-hua, LI Yun-zhong, CHENG Jin-hai, et al. Analysis on Impact of the Protection Project for Yangtze River Bed Downstream of Gezhouba Project[J]. Yangtze River, 2012, (11):102-105.(in Chinese))
[3] 牛兰花, 张小峰, 李云中.葛洲坝枢纽下游河床护底结构型式比选试验[J].武汉大学学报(工学版), 2008, (1):50-54. (NIU Lan-hua, ZHANG Xiao-feng, LI Yun-zhong, et al. Comparative Experiments of Protection Material for Yangtze River Bed Downstream of Gezhouba Project[J]. Engineering Journal of Wuhan University, 2008, (1): 50-54. (in Chinese))
PDF(1984 KB)

Accesses

Citation

Detail

Sections
Recommended

/