Model Test on High Head Flood Dischargefrom Multi-tunnels to Narrow Water Course

LIU Da, WANG Jun-xing, ZHANG Ying-ying

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (4) : 35-38.

PDF(2058 KB)
PDF(2058 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (4) : 35-38. DOI: 10.3969/j.issn.1001-5485.2014.04.0082014, 30(04):35-38
HYDRAULICS

Model Test on High Head Flood Dischargefrom Multi-tunnels to Narrow Water Course

  • LIU Da, WANG Jun-xing, ZHANG Ying-ying
Author information +
History +

Abstract

The outlet structure of the hydropower station in this research consists of several spillway tunnels for joint flood discharge. It has a large discharge volume and high water head, with narrow river course at the outlet, and the downstream plunge pool is located at the turn of the river. Owing to this, the energy of the discharge is concentrated and the returning of the trajectory nappe is deviated. To address these two problems, we put forward the flip bucket layout suitable for the actual situation by means of large-scale hydraulic model test. By comparing different schemes and considering the overall joint discharge and energy dissipation, we proposed the optimal layout design. It could serve as a reference for similar projects.

Key words

hydraulic model test / spillway tunnel / energy dissipation and erosion control / joint discharge / flip bucket optimization

Cite this article

Download Citations
LIU Da, WANG Jun-xing, ZHANG Ying-ying. Model Test on High Head Flood Dischargefrom Multi-tunnels to Narrow Water Course[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(4): 35-38 https://doi.org/10.3969/j.issn.1001-5485.2014.04.0082014, 30(04):35-38

References

[1] 赵 昕, 张晓元, 赵明登, 等.水力学[M].北京:中国电力出版社, 2009.(ZHAO Xin, ZHANG Xiao-yuan, ZHAO Ming-deng, et al. Hydraulics [M]. Beijing: China Electric Power Press, 2009.(in Chinese))
[2] 左启东.模型试验的理论和方法[M].北京:水利电力出版社, 1984.(ZUO Qi-dong. Theories and Methods of Model Test[M]. Beijing: Water Resources and Electric Power Press, 1984.(in Chinese))
[3] 彭儒武, 李长峰, 宋德明, 等.动床模型试验中存在问题的辨析[J].山东农业大学学报(自然科学版), 2002, 33(4):477-482.(PENG Ru-wu, LI Chang-feng, SONG De-ming, et al. Analysis of Movable Bed Model Test Problems[J]. Journal of Shandong Agricultural University (Social Science Edition), 2002, 33(4):477-482.(in Chinese))
[4] 王才欢, 黄国兵, 侯冬梅.水布垭水电站泄洪消能防冲试验研究[J].人民长江, 2007, 38(4):15-17.(WANG Cai-huan, HUANG Guo-bing, HOU Dong-mei. Energy Dissipation Test for the Spillway of Shuibuya Hydropower Station[J]. Yangtze River, 2007, 38(4):15-17.(in Chinese))
[5] SL279—2002.水工隧洞设计规范[S].北京:水利水电出版社, 2002.(SL279—2002, Specification for Design of Hydraulic Tunnel[S]. Beijing: China Water Power Press, 2002.(in Chinese))
[6] 焦爱萍, 刘 艳. 溪洛渡水电站泄洪洞出口挑流鼻坎体型优化研究[J]. 水利水电技术, 2007, 38(3):40-43.(JIAO Ai-ping, LIU Yan. Research on Shape Optimization for Flip Bucket of Spillway Tunnel for Xiluodu Hydropower Station [J]. Water Resources and Hydropower Engineering, 2007, 38(3):40-43.(in Chinese))
[7] 李 炜. 水力计算手册[M]. 北京:中国水利水电出版社, 2006.(LI Wei. Hydraulic Calculation Manual [M]. Beijing: China Water Power Press, 2006.(in Chinese))
[8] 游 湘, 曾 勇. 锦屏一级水电站泄洪消能布置设计[C]∥泄水建筑物安全及新材料、新技术应用论文集, 深圳: 中国水利技术信息中心, 2011:134-139.(YOU Xiang, ZENG Yong. Flood Design of Energy Dissipation Layout for Jinping Hydropower Station[C]∥Proceedings of Discharge Structure Safety, New Materials and New Technology Applications. Shenzhen: China Water Conservancy and Technical Information Center, 2011: 134-139.(in Chinese))
[9] 王才欢, 侯冬梅, 向光红. 高水头放空洞泄洪消能试验研究与运用[J]. 长江科学院院报, 2010, 27(4): 36-39.(WANG Cai-huan, HOU Dong-mei, XIANG Guang-hong. Research and Utilization on Flood Discharging and Energy Dissipating for Emptying Tunnel with High Head[J]. Journal of Yangtze River Scientific Research Institute, 2010, 27(4):36-39.(in Chinese))
[10]王金国. 水工建筑物的破坏及防治措施研究[D]. 成都:四川大学, 2002.(WANG Jin-guo. Research on the Breakage of Hydraulic Structure and the Preventions Measures[D]. Chengdu: Sichuan University, 2002.(in Chinese))
[11]高玉磊, 王 韦, 邓 军, 等. 高水头泄洪隧洞消能防冲试验研究[J]. 人民黄河, 2010, 32(10):148-149.(GAO Yu-lei, WANG Wei, DENG Jun, et al. Energy Dissipation Test for High Head Spillway Tunnel [J]. Yellow River, 2010, 32(10):148-149.(in Chinese))
[12]黄国兵, 谢世平, 段文刚. 高坝泄洪挑流消能工优化研究与应用[J]. 长江科学院院报, 2011, 28(10):90-93.(HUANG Guo-bing, XIE Shi-ping, DUAN Wen-gang. Optimization and Application of Energy Dissipation Works for Ski Jump Spillway at High Dams[J]. Journal of Yangtze River Scientific Research Institute, 2011, 28(10): 90-93.(in Chinese)).[13]高仪生, 陈 俊, 曾 泳. 水布垭水利枢纽溢洪道一级挑流消能方案优化试验[J]. 长江科学院院报, 1999, 16(1):9-12.(GAO Yi-sheng, CHEN Jun, ZENG Yong. Optimum Test on Ski-Jump Energy Dissipation Schemes of Shuibuya Project’s Overflow Spillway [J]. Journal of Yangtze River Scientific Research Institute, 1999, 16(1):9-12. (in Chinese))
PDF(2058 KB)

Accesses

Citation

Detail

Sections
Recommended

/