Earthwork Balance Optimization Design for Stepped Leveling Project

JIANG Qing-hua,CHENG Jiang-tao,CAI Qing,YU Chen-xiang

Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (1) : 85-91.

PDF(3618 KB)
PDF(3618 KB)
Journal of Changjiang River Scientific Research Institute ›› 2014, Vol. 31 ›› Issue (1) : 85-91. DOI: 10.3969/j.issn.1001-5485.2014.01.0182014,31(01):85-91
Orignal Article

Earthwork Balance Optimization Design for Stepped Leveling Project

  • JIANG Qing-hua,CHENG Jiang-tao,CAI Qing,YU Chen-xiang
Author information +
History +

Abstract

In view of the complexity and particularity of stage field-leveling construction project,an earthwork balance optimization design based on field-leveling characteristic parameter was presented. The method takes the effect of (stage board) designed elevation adjustment on project cost,slope supporting investment and basic investment of structures into consideration. First,the reasonable excavation slope magnitudes were determined by analyzing the site’s topographic slope. Then according to dig-fill volume,area and unbalanced coefficient of different field-leveling units,the controlled and dependent field-leveling units were determined. In the controlled field-leveling unit,we select the critical excavation unit and filling unit. On this basis,the optimized parameters based on the critical excavation unit and the critical filling unit was obtained and then the earthwork balance optimization mathematical model was established. Finally,the optimization design method was verified to be practical and effective with a large-scale construction project of cement clinker production line as an example in consideration of the expansion effect of the excavation and filling. Results show that the optimized excavation volume was decreased by 173 000 cubic meters,the excavation volume of slope was decreased by 20 400 cubic meters,and the total dig-fill unbalance coefficient was reduced from 1.59 to 0.97,which reduced the project cost and the construction difficulty.

Key words

stepped field leveling / earthwork calculation / earthwork equilibrium / optimization design / field unit

Cite this article

Download Citations
JIANG Qing-hua,CHENG Jiang-tao,CAI Qing,YU Chen-xiang. Earthwork Balance Optimization Design for Stepped Leveling Project[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(1): 85-91 https://doi.org/10.3969/j.issn.1001-5485.2014.01.0182014,31(01):85-91

References

[1] 陈 钢,陈 朝. 糯扎渡心墙堆石坝土石方调配平衡研究[J]. 长江科学院院报,2009,26(6):60-62.(CHEN Gang,CHEN Zhao. Research on Balancing Earth Rock Works Allocation of Nuozhadu Core Rockfill Dam[J]. Journal of Yangtze River Scientific Research Institut,2009,26(6):60-62.(in Chinese))
[2] DENG T J,HE H Z. Deviation Analysis of Earthwork Calculated by Square Grid Method[C]∥Proceedings of the 2nd International Conference on Management Science and Engineering Management. UK: World Academic Union,November 3-8,2008: 594-600.
[3] 周越轩,刘学军,杨治洪,等. 基于DTM的土方工程计算与精度分析[J]. 长沙交通学院学报,2000,16(4):39-43.(ZHOU Yue-xuan,LIU Xue-jun,YANG Zhi-hong,et al. Earthwork Volume Calculation and Accuracy Analysis Based on Digital Terrain Model[J]. Journal of Changsha Communication University,2000,16(4):39-43.(in Chinese))
[4] 柳长顺,齐 实,杜丽娟. 土地整理项目土方量计算方法[J]. 中国水土保持科学,2003,1(2):77-79.(LIU Chang-shun,QI Shi,DU Li-juan. Method to Calculate Earthwork in Land Consolidation Project[J]. Science of Soil and Water Consveration,2003,1(2):77-79.(in Chinese))
[5] 罗德仁,邹自力,汤江龙. 工程土方量计算比较分析[J].东华理工学院学报,2005,28(1):59-64.(LUO De-ren,ZOU Zi-li,TANG Jiang-long. Contrasting and Analysis of the Method of Earthwork Calculate[J]. Journal of East China Institute of Technology,2005,28(1):59-64.(in Chinese))
[6] AL-JIBOURI S H,MAWDESLEY M J,ASKEW B H,et al. A Computer System for Modeling the Process of Earthwork Planning in Linear Construction Projects[J]. International Journal of Computer Applications in Technology,2004,20(1/2/3):90-101.
[7] BURAK G A,HILMI L A.Method for Balancing Cut-Fill and Minimizing the Amount of Earthwork in the Geometric Design of Highways[J]. Journal of Transportation Engineering,2003,129(5):564-571.
[8] HARMANANI H M,ZOUEIN P P,HAJAR A M. A Parallel Genetic Algorithm for the Geometrically Constrained Site Layout Problem With Unequal size Facilities[J]. International Journal of Computational Intelligence & Application,2004,4(4):375-400.
[9] 陈玉莹,吴小燕,庞逸群. 复杂地区土方量计算的一种新方法[J]. 勘察科学技术,2009,(6):53-57.(CHEN Yu-ying,WU Xiao-yan,PANG Yi-qun. A New Method of Earthwork Calculation in Complex Areas[J].Site Investigation Science and Technology,2009,(6):53-57. (in Chinese))
PDF(3618 KB)

Accesses

Citation

Detail

Sections
Recommended

/