PDF(1694 KB)
Dynamic Risk Assessment of Flood Detention Areas Coupled with Emergency Evacuation
WANG Han, LU Cheng-wei, WANG Le, GUO Peng, LIU Jia-ming
Journal of Changjiang River Scientific Research Institute ›› 2026, Vol. 43 ›› Issue (11) : 86-93.
PDF(1694 KB)
PDF(1694 KB)
Dynamic Risk Assessment of Flood Detention Areas Coupled with Emergency Evacuation
[Objective] Risk assessment for the operation of flood storage and detention areas is an important technical support for operation decision-making, risk control and emergency response. Conventional static assessments often fail to quantify the risk-reduction effect of emergency evacuation. This study develops a dynamic risk assessment framework by coupling flood evolution with evacuation response. [Methods] The framework consists of four functional models: flood-front temporal characterization, evacuation spatio-temporal trajectory simulation, flood-evacuation competition judgement, and dynamic exposure-loss assessment. It identifies the affected population as successfully evacuated population and population at risk, and dynamically updates household property exposure according to warning response and evacuation process. [Results] The case study of the 2024 Tuanzhou polder breach shows that the model estimated 5 360 successfully evacuated residents, 85 people at risk and 327 million yuan of household property loss, which is close to the actual 5 372 successfully evacuated, 73 people at risk and 380 million yuan of household property loss. The estimated loss is much lower than the static household property loss of 1.402 billion yuan. Sensitivity analysis shows that evacuation speed within 8-15 m/s has limited influence on the population at risk, while the delay between flood inflow and evacuation initiation is the key factor controlling the population at risk. If evacuation starts within 10 min after flood inflow, all residents can be safely evacuated in the simulated scenarios. Household property loss is jointly affected by warning time and preparation duration: warning time determines the available evacuation window, whereas preparation duration affects departure time and transferable asset proportion. When warning is issued 30 min before inflow and preparation lasts 30-40 min, the household property loss can decrease to 295 million yuan. [Conclusions] The proposed framework can better represent the actual risk state after evacuation and provide quantitative support for warning threshold setting, evacuation plan optimization and rescue-force deployment in flood detention areas.
flood storage and detention area / emergency evacuation / dynamic risk assessment / population at risk
| [1] |
胡维忠, 王乐, 刘佳明. 长江流域防洪工程体系能力提升建设思路[J]. 中国水利, 2022(5): 31-34.
(
|
| [2] |
王乐, 要威, 蒋磊, 等. 变化环境下流域蓄滞洪区布局优化研究[J]. 人民长江, 2025, 56(3): 30-38, 62.
(
|
| [3] |
向立云. 洪水风险图编制与应用概述[J]. 中国水利, 2017(5): 9-13.
(
|
| [4] |
张念强, 王静, 李娜. 洪水动态风险分析技术对防汛应急工作的支撑:以海河“23·7”流域性特大洪水期间兰沟洼蓄滞洪区运用为例[J]. 中国防汛抗旱, 2023, 33(9):39-44.
(
|
| [5] |
王艳艳, 李娜, 王杉, 等. 洪灾损失评估系统的研究开发及应用[J]. 水利学报, 2019, 50(9):1103-1110.
(
|
| [6] |
王艳艳, 李娜, 王杉, 等. 洪水影响分析与损失评估系统的开发和思考[J]. 中国防汛抗旱, 2020, 30(6):15-19.
(
|
| [7] |
王小杰, 夏军强, 李启杰, 等. 长江中下游地区洪灾损失率函数构建及洪涝灾害损失评估[J]. 水资源保护, 2023, 39(5): 88-98.
(
|
| [8] |
果鹏, 夏军强, 陈倩, 等. 基于力学过程的蓄滞洪区洪水风险评估模型及应用[J]. 水科学进展, 2017, 28(6): 858-867.
(
|
| [9] |
童超, 詹晗煜, 崔罡, 等. 融合ResNet神经网络与水动力模型的洪水演进快速预测算法[J/OL]. 水资源保护, doi:10.3880/j.issn.1004-6933.2026.01.014.(TongChao,ZhanHanyu,CuiGang, et al. A rapid flood routing prediction algorithm integrating ResNet neural network and hydrodynamic model[J/OL]. Water Resources Protection,doi:10.3880/j.issn.1004-6933.2026.01.014.) (in Chinese)
|
| [10] |
赵宇, 梁益银, 鹿鹏程, 等. 基于STFS-Urban的秀水河流域洪涝过程模拟[J]. 水利水电技术(中英文), 2025, 56(10): 31-45.
(
|
| [11] |
余再康, 程井, 余雷, 等. 基于遥感影像的溃坝风险人口估算模型研究[J]. 人民黄河, 2025, 47(4): 44-50.
(
|
| [12] |
李娜, 王艳艳, 王静, 等. 洪水风险管理理论与技术[J]. 中国防汛抗旱, 2022, 32(1): 54-62.
(
|
| [13] |
|
| [14] |
|
| [15] |
徐志, 马一鸣, 梁伟佳, 等. 团洲垸溃堤洪水演进过程模拟与应急撤离过程推演[J]. 水利水电技术(中英文), 2025, 56(12): 27-40.
【目的】洪水来临时,应急撤离工作的高效开展对于保护当地居民的生命财产安全至关重要,由于溃堤洪水具有突发性且演进速度快,需要探究洪水演进对应急撤离过程的影响。【方法】以华容县团洲垸溃堤洪水演进过程和应急撤离过程为研究对象,采用Dijkstra算法识别团洲垸内村庄的应急撤离路径,结合ANUGA模型计算的溃堤洪水淹没过程,分析洪水演进对于应急撤离过程的影响。【结果】ANUGA模型的模拟水位过程与实测水位过程基本一致,纳什效率系数为0.97,表明模型可较好的模拟团洲垸溃堤后的洪水演进过程;团洲垸主要村庄的撤离路线长度范围为4~11 km,撤离总耗时均超过60 min,撤离所需时间最长为80.3 min;团洲垸北部村庄的撤离路径远,通行耗时久,中部和南部村庄由于人口主要集中在055乡道附近,当以055乡道为撤离路径时车辆密度较大,使得道路通行速度降低,通行时间长;由于溃口位置在团洲垸北部、团洲垸中部和北部村庄的应急撤离道路在溃堤2 h内受到洪水影响,南部村庄的撤离路线在溃口3 h之后开始逐渐被洪水淹没。当提前1 h预警时,团洲垸人员均可安全撤离,但当提前0.5 h预警或预警时间更晚时,洪水将会造成北部村庄出现未成功撤离人员。【结论】如果溃口出现在北部堤防,位于团洲垸北部的村庄洪水风险较大,亟需开展团洲垸北部安全区的规划建设;需对村庄的溃堤洪水应急撤离方案进行合理规划,减少因车辆拥堵导致的通行效率降低;同时应加强团洲垸堤防维护与巡查工作,提升灾害感知和预警能力。研究成果可为团洲垸区域防洪减灾规划和人员应急撤离提供参考借鉴。
(
[Objective] The efficient execution of emergency evacuation operations is crucial for protecting the lives and property of local residents when a flood occurs. Due to the sudden nature of breach floods and their rapid progression, it is necessary to investigate the impact of flood evolution on the evacuation process. [Methods] The breach flood evacuation process and evolution process of the Tuanzhou embankment in Huarong County were taken as the research object. The Dijkstra algorithm was used to identify emergency evacuation paths for villages within Tuanzhou embankment. The breach flood inundation process, calculated by the ANUGA model, was combined to analyze the impact of flood evolution on the emergency evacuation process. [Results] The simulated water levels from the ANUGA model align closely with the observed water levels, with a Nash efficiency coefficient of 0.97, indicating the model's high accuracy in simulating the flood evolution process following the embankment breach in Tuanzhou embankment. The evacuation route lengths for the main villages in Tuanzhou embankment ranged from 4 to 11 km, with the total evacuation time being exceeded 60 minutes for all routes, and the longest evacuation time being 80.3 minutes. The evacuation routes for villages in the northern part of Tuanzhou embankment were long, resulting in extended travel times. For villages in the central and southern parts, where the population was mainly concentrated near the 055 township road, the vehicle density was higher when the 055 township road was used as the evacuation route, which result ed in reduced road travel speed and increased travel time. Due to the breach being located in the northern part of Tuanzhou embankment, emergency evacuation routes for villages in the central and northern regions were affected by flooding within 2 hours of the embankment breach, while evacuation routes for southern villages began to be inundated approximately 3 hours after the breach. When a 1 hour early warning was issued, all residents in Tuanzhou embankment could be safely evacuated. However, when the early warning was issued 0.5 hours in advance or later, the flood resulted in residents in the northern villages being unable to evacuate successfully. [Conclusion] If a breach occurs at the northern embankment, the villages in the northern part of Tuanzhou embankment will face a higher flood risk, highlighting the urgent need for planning and constructing a safety zone in the northern area of Tuanzhou embankment. The emergency evacuation plans for embankment breach floods in the villages need to be reasonably planned to reduce the decrease in traffic efficiency caused by vehicle congestion and to improve the regional emergency response capability. At the same time, efforts should be made to strengthen the maintenance and inspection of Tuanzhou embankment, as well as to improve disaster perception and early warning capabilities. The findings provide valuable references for flood control and disaster reduction planning, as well as for emergency evacuation of residents in the Tuanzhou embankment. |
/
| 〈 |
|
〉 |