Optimized Hierarchical Joint Dispatching of Sluices-Pumps in Polder Areas of Plain Tidal River Networks under Extreme Rainfall: Case Study in Qingsong Region, Shanghai

WANG Jie-chun, CHEN Yu

Journal of Changjiang River Scientific Research Institute ›› 2026, Vol. 43 ›› Issue (11) : 203-210.

PDF(10403 KB)
PDF(10403 KB)
Journal of Changjiang River Scientific Research Institute ›› 2026, Vol. 43 ›› Issue (11) : 203-210. DOI: 10.11988/ckyyb.20260101
DISASTER MECHANISMS AND INTELLIGENT PREVENTION AND CONTROL OF URBAN FLOODING

Optimized Hierarchical Joint Dispatching of Sluices-Pumps in Polder Areas of Plain Tidal River Networks under Extreme Rainfall: Case Study in Qingsong Region, Shanghai

Author information +
History +

Abstract

[Objective] Current research on waterlogging control in plain tidal river networks predominantly relies on numerical simulations, often lacking specific rule-based studies on control water level thresholds under extreme hydrological conditions. This deficiency frequently leads to excessive drainage from polders, exacerbating waterlogging risks within larger hydraulic zones. By simulating river network hydrodynamics, this study systematically diagnoses the deficiencies in existing dispatching methods and proposes a hierarchical optimization scheme centered on “pump activation water levels.” The aim is to enhance refined flood control dispatching and risk response capabilities in Shanghai and similar plain tidal river networks. [Methods] Taking the Qingsong Region in Shanghai during Typhoon “In-Fa” as a case study, we analyzed rainfall intensity, water level dynamics, and the status quo of the “two-level control and two-level drainage” dispatching mode. A river network hydrodynamic model was employed to simulate the region’s response under various rainfall scenarios, serving as the basis for proposing the hierarchical optimization scheme. [Results] The analysis indicates an inverse relationship between pump activation levels and flood risk: lower activation water levels in polders increase water storage capacity, effectively suppressing water levels in the main Qingsong Hydraulic Zone and enhancing overall flood safety. Reasonable control thresholds were identified to balance the restriction of excessive drainage with the maximization of river channel regulation and storage. Specifically, a pump activation level of 2.3 m is recommended when the forecasted daily rainfall is ≤100 mm, while a level of 2.0 m is advised when rainfall exceeds 100 mm. [Conclusion] To better coordinate polder management, we recommend conducting further dispatching experiments to validate these findings, refine control parameters, and facilitate the translation of research outcomes into regulatory guidelines. While this novel approach is applicable to other regions, the critical pump activation thresholds must be recalibrated for different hydraulic zones based on their specific external drainage capacities (pump/sluice scales) and river network storage volumes.

Key words

extreme rainfall / water conservancy areas / polder areas / sluice and pumping station discharge / joint dispatching of polder areas / hierarchical dispatching / plain tidal river network

Cite this article

Download Citations
WANG Jie-chun , CHEN Yu. Optimized Hierarchical Joint Dispatching of Sluices-Pumps in Polder Areas of Plain Tidal River Networks under Extreme Rainfall: Case Study in Qingsong Region, Shanghai[J]. Journal of Changjiang River Scientific Research Institute. 2026, 43(11): 203-210 https://doi.org/10.11988/ckyyb.20260101

References

[1]
丁国川. 上海市圩区建设对策与建议[J]. 中国防汛抗旱, 2025, 35(9): 82-85.
(Ding Guochuan. Countermeasures and suggestions for the construction of polder areas in Shanghai City[J]. China Flood & Drought Management, 2025, 35(9): 82-85. (in Chinese))
[2]
刘克强, 蔡文婷. 太湖流域圩区治理现状调查与思考[J]. 中国防汛抗旱, 2023, 33(8): 19-22, 28.
(Liu Keqiang, Cai Wenting. Investigation and thinking on the present situation of polder governance in Taihu Basin[J]. China Flood & Drought Management, 2023, 33(8): 19-22, 28.(in Chinese))
[3]
卢少为, 朱勇辉, 魏国远, 等. 平原湖区排涝模拟研究:以大通湖垸为例[J]. 长江科学院院报, 2009, 26(7):1-5.
Abstract
长江中下游平原湖区涝灾极为严重。以洞庭湖腹地大通湖垸为例,基于平面二维水流数学模型,采用有限体积法和非结构网格,研究该区域在不同外洪条件与不同降雨组合条件下的沥涝情况,得出了区域内涝灾分布情况及致涝率,并定量计算分析了外洪水位变化对内涝造成的不利影响。模型计算结果可为涝灾预测与评估提供技术支持。
(Lu Shaowei, Zhu Yonghui, Wei Guoyuan, et al. Numerical modeling for draining waterlogging[J]. Journal of Yangtze River Scientific Research Institute, 2009, 26(7): 1-5. (in Chinese))
Waterlogging in the middle and lower reaches of the Yangtze River is very severe. In the paper, on the basis of the two-dimensional flow model and by applying the finite volume method and unstructured mesh, the waterlogging and drainage of the Datong Lake-polder with different precipitations and floods were studied. The spatial distribution of waterlogging in the Lake-polder area and the ratio of waterlogging were gained. The negative influence of the floods on the waterlogging was analyzed quantitatively. The model results can provide technological support for the waterlogging forecasting and assessment.
[4]
钱真, 贾卫红. 基于GIS的感潮地区城市区域除涝能力评估[J]. 水电能源科学, 2014, 32(3):85-87,102.
(Qian Zhen, Jia Weihong. Urban zonal water logging control evaluation in tidal region based on GIS[J]. Water Resources and Power, 2014, 32(3):85-87,102.(in Chinese))
[5]
高丽莎, 高程程, 汪涛. 基于精细化河网水动力模型的长宁区除涝能力评估[J]. 水资源保护, 2021, 37(5):62-67.
(Gao Lisha, Gao Chengcheng, Wang Tao. Assessment of waterlogging control capacity in Changning District based on refined river network hydrodynamic model[J]. Water Resources Protection, 2021, 37(5):62-67. (in Chinese))
[6]
丁国川. 上海西部地区“烟花”台风期间高水位成因分析与对策[J]. 长江科学院院报, 2024, 41(11):95-101.
Abstract
为应对上海西部地区在极端天气时面临的严峻洪涝挑战,提出有效的水位调控策略,选取“烟花”台风期间青松片为研究对象,综合分析实际雨情与工况数据,包括降雨、片内圩外河道水位、二级圩区水位、片外河道水位过程等,提出二级圩区河湖超蓄和控制圩区雨峰过后排水2种策略,运用数字化地形分析与除涝数值模拟技术,评估对缓解高水位的有效性。研究发现,实施策略能大幅度增强蓄滞能力,二级圩区河湖超蓄措施可增加圩区蓄滞能力1 169.8万m3,控制圩区雨峰过后排水措施可增加圩区蓄滞能力245.9万m3,可降低片内圩外河道水位30 cm左右,有效缓解高水位。研究不仅验证了策略的有效性,而且在现有防洪排涝体系上增添了新的调控手段,为城市在面临重大水情挑战时提供了科学的调度决策依据,对于构建更加韧性的水管理体系、保障城市安全运行具有重要的实践价值与理论贡献。
(Ding Guochuan. Cause analysis and countermeasures of high water level during “Fireworks” Typhoon in Western Shanghai[J]. Journal of Changjiang River Scientific Research Institute, 2024, 41(11):95-101. (in Chinese))
[7]
魏清福. 平原河网圩区水利工程生态调度方案研究:以苏州吴中城南包围为例[J]. 人民长江, 2022, 53(10):31-36.
(Wei Qingfu. Ecological operation scheme of water conservancy project in plain river network polder area: case of Chengnan Polder Area in Wuzhong District,Suzhou City[J].Yangtze River, 2022, 53(10):31-36. (in Chinese))
[8]
Tang L, Gong L. Study on the joint operation scheme of key water conservancy projects in the Taihu Lake Basin: a case study on ensuring flood control safety[J]. Advances in Engineering Innovation, 2026, 17(1): 21-30.
[9]
Patel R K, Soni P, Singh P. GIS-based multi-criteria flood risk assessment using AHP in the Arpa River Basin, Chhattisgarh[J]. Journal of the Indian Society of Remote Sensing, 2026, 54(4): 1501-1522.
[10]
徐家贵, 戴晶晶, 李琛, 等. 太湖流域防洪新形势及治理对策[J]. 中国水利, 2024(12):63-68.
(Xu Jiagui, Dai Jingjing, Li Chen, et al. New situation of flood control in the Taihu Basin and measure study[J]. China Water Resources, 2024(12):63-68. (in Chinese))
[11]
刘晓涛. 上海市防御台风“烟花”的经验与启示[J]. 中国水利, 2021(21): 38-40.
(Liu Xiaotao. Fighting against typhoon In-Fa: Shanghai’s experiences and enlightenment[J]. China Water Resources, 2021(21): 38-40. (in Chinese))
[12]
沙治银. 上海市防御202106号台风“烟花”的过程及思考[J]. 中国防汛抗旱, 2022, 32(4):52-54.
(Sha Zhiyin. The process and thinking of Shanghai’s defense against Typhoon “In-Fa” No. 202106[J]. China Flood & Drought Management, 2022, 32(4):52-54. (in Chinese))
[13]
李晓云, 蔡浚, 羊丹. 台风“烟花”影响期间上海市水闸泵站运行调度分析[J]. 中国水利, 2021(23):74-76.
(Li Xiaoyun, Cai Jun, Yang Dan. Analysis of operation and dispatch of Shanghai sluice and pumping station during the impact of Typhoon “Fireworks”[J]. China Water Resources, 2021(23):74-76. (in Chinese))
[14]
徐贵泉, 宋德蕃, 黄士力, 等. 感潮河网水量水质模型及其数值模拟[J]. 应用基础与工程科学学报, 1996, 4(1): 94-105.
(Xu Guiquan, Song Defan, Huang Shili, et al. Hydraulics and water quality model for tidal river network and numerical simulation[J]. Journal of Basic Science and Engineering, 1996, 4(1): 94-105. (in Chinese))
[15]
陈长太, 李学峰. 上海市防洪除涝工程管理现状与对策分析[J]. 水利建设与管理, 2021, 41(12): 49-53.
(Chen Changtai, Li Xuefeng. Analysis on current situation and countermeasures of flood control and waterlogging removal project management in Shanghai[J]. Water Conservancy Construction and Management, 2021, 41(12): 49-53. (in Chinese))
PDF(10403 KB)

Accesses

Citation

Detail

Sections
Recommended

/

〈 〉