Selection of Sealing Structure of Compressed Air Energy Storage Lined Rock Cavern with Grade Ⅲ Surrounding Rock Mass

HUANG Xiang-yi, JIANG Zhong-ming, ZHANG Shi-shu, ZHANG Jing, LU Xi

Journal of Changjiang River Scientific Research Institute ›› 2026, Vol. 43 ›› Issue (9) : 110-120.

PDF(3917 KB)
PDF(3917 KB)
Journal of Changjiang River Scientific Research Institute ›› 2026, Vol. 43 ›› Issue (9) : 110-120. DOI: 10.11988/ckyyb.20250767
Rock-Soil Engineering

Selection of Sealing Structure of Compressed Air Energy Storage Lined Rock Cavern with Grade Ⅲ Surrounding Rock Mass

Author information +
History +

Abstract

[Objective] This study systematically investigates the synergistic interaction between the lining structure (comprising the steel liner, concrete lining, and flexible sealing layer) and the surrounding rock mass of compressed air energy storage (CAES), and proposes optimization methods for key design parameters to enhance the technical feasibility and economic viability of such storage caverns under broader geological conditions. [Methods] Comprehensive finite-element simulations were performed to evaluate the effects of critical variables, including surrounding rock mass grade, lining parameters (thickness, concrete strength, and reinforcement ratio), and sealing layer characteristics (thickness, structural form, and material properties), on the structural mechanical responses (stress distribution, strain evolution, and cracking behavior). In particular, to address the common engineering challenge of concrete lining cracking, this study quantitatively assessed the risk of crack indentation failure in the flexible sealing layer. On this basis, a novel thickness design criterion for the rubber sealing layer based on an anti-indentation criterion was proposed for the first time. [Results] (1) Baseline design suitability and geological constraints: A composite structure consisting of a 24-mm-thick Q235 steel liner and a 500-mm-thick C40 concrete lining demonstrated sufficient capacity to meet the sealing and strength requirements for a storage cavern at a burial depth of 200 m in Grade Ⅰ and Grade Ⅱ surrounding rock masses. However, in Grade Ⅲ surrounding rock mass, the maximum tensile stress in the steel liner exceeded the yield strength of Q235 steel, indicating a potential risk of structural failure. In Grade Ⅳ and Grade Ⅴ surrounding rock masses, neither the sealing structure nor the surrounding rock provided the conditions required for constructing a storage cavern that was both safe and economically feasible. (2) Effect of lining reinforcement: Simply increasing the lining thickness or improving the concrete grade had a negligible effect on enhancing the structural stress-deformation behavior. In contrast, reinforcement measures effectively controlled the crack width of the lining. With a reinforcement ratio of 0.5%, the maximum crack width was controlled within 2 mm. Notably, as the reinforcement ratio increased from 0.5% to 1.5%, the maximum crack width decreased to below 1.0 mm, and the number of cracks within the 0.5-1.0 mm range decreased. However, this was accompanied by a redistribution effect, where the number of fine cracks (0.1-0.5 mm) increased significantly from 20 to 38, suggesting that reinforcement effectively dispersed concentrated macro-cracks into distributed micro-cracks. (3) Steel liner optimization and groundwater challenges: Increasing the steel liner thickness to 30 mm still failed to meet the strength requirements; further thickening produced diminishing returns while significantly increasing construction costs. Additionally, in areas with abundant groundwater, a 24-mm-thick steel liner provided limited resistance, withstanding an external water pressure of only 0.23 MPa. If the external water pressure reached 1.0 MPa, the critical thickness required to prevent buckling instability would exceed 100 mm, making the design economically infeasible. (4) Innovative structural forms and sealing layer criterion: Adopting segmented or corrugated steel liner structures could decouple liner deformation from the surrounding rock mass, reducing tensile stress and strain by more than 70%. Regarding the rubber sealing layer, its circumferential strain under an internal pressure of 10 MPa remained far below the material limit. However, to prevent the rubber from being extruded into cracks and causing indentation failure after the lining cracks, it was determined that the thickness of the rubber sealing layer should not be less than 6 mm. [Conclusion] Constructing CAES caverns in Grade Ⅲ surrounding rock mass with sufficient burial depth is feasible, provided that optimized steel liners, reinforced concrete lining for crack-width control, and a flexible sealing layer of adequate thickness are employed to ensure sealing reliability and overall stability. Since reinforcement cannot completely eliminate lining cracking, the engineering objective should shift towards controlling the crack width within an allowable range that prevents indentation failure of the sealing layer. For areas with active groundwater, relying solely on increasing steel liner thickness to resist external water pressure is uneconomical. Instead, proactive waterproofing or drainage measures around the cavern are necessary. Most significantly, this study proposes, for the first time, a quantitative design criterion for rubber thickness to prevent crack indentation failure. This contribution provides direct design guidance for engineering practice, thereby improving the technical adaptability and safety of lined rock cavern gas storage facilities under complex geological conditions.

Key words

compressed air energy storage / Grade III surrounding rock mass / gas storage lined rock cavern / sealing structure selection / flexible sealing layer

Cite this article

Download Citations
HUANG Xiang-yi , JIANG Zhong-ming , ZHANG Shi-shu , et al . Selection of Sealing Structure of Compressed Air Energy Storage Lined Rock Cavern with Grade Ⅲ Surrounding Rock Mass[J]. Journal of Changjiang River Scientific Research Institute. 2026, 43(9): 110-120 https://doi.org/10.11988/ckyyb.20250767

References

[1]
齐帅, 王现勋, 曾坤, 等. 水风光打捆模式下新能源占比对水电机组效率的影响[J]. 长江科学院院报, 2023, 40(1): 43-50.
Abstract
水风光打捆可为新能源大规模高效、安全并网提供重要保障,有助于提高清洁能源利用效率,进而早日实现“双碳愿景目标”,但也将加剧对水电机组运行效率的影响。重点探讨了水风光打捆模式下不同新能源占比对水电机组效率的影响以及规律。首先,构建了水风光打捆送出模式下的日调度模型,然后以乌东德水电站及其附近的虚拟风、光电场为研究对象开展了算例研究。结果表明:随着新能源占比的增加,在枯期水电机组的运行效率会下降,而在汛期则呈现先升后降的规律;对比发现,在相同装机条件下,汛期水电机组效率的日内波动性较枯期小,汛期进行水风光打捆更有利于提高水电机组的运行效率。研究成果可为新能源大规模消纳背景下的装机容量优化配置和水电机组优化运行提供参考依据。
(Qi Shuai, Wang Xianxun, Zeng Kun, et al. Influence of new energy ratio on hydropower unit efficiency under hydro-wind-solar bundling mode[J]. Journal of Changjiang River Scientific Research Institute, 2023, 40(1): 43-50. (in Chinese))
[2]
Kim H M, Rutqvist J, Ryu D W, et al. Exploring the concept of compressed air energy storage (CAES) in lined rock caverns at shallow depth: A modeling study of air tightness and energy balance[J]. Applied Energy, 2012, 92: 653-667.
[3]
He Wei, Luo Xing, Evans D, et al. Exergy storage of compressed air in cavern and cavern volume estimation of the large-scale compressed air energy storage system[J]. Applied Energy, 2017, 208: 745-757.
[4]
Qin Shikang, Xia Caichu, Zhou Shuwei. Air tightness of compressed air storage energy caverns with polymer sealing layer subjected to various air pressures[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2023, 15(8): 2105-2116.
[5]
蒋中明, 唐栋, 李鹏, 等. 压气储能地下储气库选型选址研究[J]. 南方能源建设, 2019, 6(3): 6-16.
(Jiang Zhongming, Tang Dong, Li Peng, et al. Research on selection method for the types and sites of underground repository for compressed air storage[J]. Southern Energy Construction, 2019, 6(3): 6-16. (in Chinese))
[6]
金维平, 彭益成. 硬岩地区压缩空气储能工程地下储气洞室选址方法研究[J]. 电力与能源, 2017, 38(1): 63-67.
(Jin Weiping, Peng Yicheng. Underground gas storage cavern location method for compressed air energy storage engineering in hard rock area[J]. Power & Energy, 2017, 38(1): 63-67. (in Chinese))
[7]
孙冠华, 王娇, 于显杨, 等. 压缩空气储能电站地下内衬硐库基本原理与分析方法研究进展[J]. 岩土力学, 2025(1): 1-25.
(Sun Guanhua, Wang Jiao, Yu Xianyang, et al. Research progress on basic principles and analysis methods of lined rock caverns for compressed air energy storage station[J]. Rock and Soil Mechanics, 2025(1): 1-25. (in Chinese))
[8]
易琪, 孙冠华, 姚院峰, 等. 压缩空气储能地下内衬硐库上覆岩体稳定性分析[J]. 岩土力学, 2024, 45(12):3523-3532.
(Yi Qi, Sun Guanhua, Yao Yuanfeng, et al. Stability analysis of overlying rock mass of lined rock caverns for compressed air energy storage[J]. Rock and Soil Mechanics, 2024, 45(12): 3523-3532. (in Chinese))
[9]
夏才初, 张平阳, 周舒威, 等. 大规模压气储能洞室稳定性和洞周应变分析[J]. 岩土力学, 2014, 35(5):1391-1398.
(Xia Caichu, Zhang Pingyang, Zhou Shuwei, et al. Stability and tangential strain analysis of large-scale compressed air energy storage cavern[j]. rock and soil mechanics, 2014, 35(5): 1391-1398. (in Chinese))
[10]
Perazzelli P, Anagnostou G. Design issues for compressed air energy storage in sealed underground cavities[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2016, 8(3): 314-328.
[11]
Kim H M, Rutqvist J, Kim H, et al. Failure monitoring and leakage detection for underground storage of compressed air energy in lined rock caverns[J]. Rock Mechanics and Rock Engineering, 2016, 49(2): 573-584.
[12]
Zimmels Y, Kirzhner F, Krasovitski B. Design criteria for compressed air storage in hard rock[J]. Energy & Environment, 2002, 13(6): 851-872.
[13]
蒋中明, 李鹏, 赵海斌, 等. 压气储能浅埋地下储气库性能试验研究[J]. 岩土力学, 2020, 41(1):235-241,252.
(Jiang Zhongming, Li Peng, Zhao Haibin, et al. Experimental study on performance of shallow rock cavern for compressed air energy storage[J]. Rock and Soil Mechanics, 2020, 41(1): 235-241, 252. (in Chinese))
[14]
Park D, Kim H M, Ryu D W, et al. Probability-based structural design of lined rock caverns to resist high internal gas pressure[J]. Engineering Geology, 2013, 153: 144-151.
[15]
杨静熙, 黄书岭, 刘忠绪. 高地应力硬岩大型洞室群围岩变形破坏与岩石强度应力比关系研究[J]. 长江科学院院报, 2019, 36(2):63-70.
Abstract
岩石强度应力比是表征围岩稳定性的重要指标之一。研究围岩变形破坏与强度应力比的关系,揭示二者间的规律性联系,对高地应力硬岩大型地下洞室群围岩稳定性控制具有重要意义。以具典型高地应力特点的锦屏一级水电站和猴子岩水电站2个硬岩大型洞室群为研究对象,首先系统梳理了2个工程的围岩岩性、岩石强度和初始地应力等工程地质条件,并详细统计了洞室群施工期围岩破坏类型和数量;通过对地下洞室群围岩的岩石强度应力比进行分区,并结合围岩140多个破坏现象和发生部位,建立了高地应力硬岩大型洞室群围岩变形破坏与岩石强度应力比之间的联系;采用不同的初始地应力分级标准,并结合洞室群围岩破坏特征,验证了基于强度应力比修正的地应力分级标准对高地应力硬岩洞室群的适用性,揭示了围岩应力诱导型破坏随岩石强度应力比的变化规律。研究成果有助于今后高地应力条件下硬岩大型地下洞室群施工期围岩破坏类型预测,并为提出具有针对性的施工期围岩稳定控制措施提供参考。
(Yang Jingxi, Huang Shuling, Liu Zhongxu. Relationship between deformation failure and strength-to-stress ratio of surrounding rock of large-scale underground hard rock caverns under high geo-stress[J]. Journal of Yangtze River Scientific Research Institute, 2019, 36(2): 63-70. (in Chinese))
The ratio of rock strength to geostress is a very important indicator of surrounding rock stability. Studying the relationship between the failure and strength-to-stress ratio of surrounding rock so as to reveal their characteristic connections is of great significance for the control of surrounding rock stability of large-scale underground hard rock cavern group. With the large-scale underground hard rock caverns of Jinping hydropower plant stage-I and Houziyan hydropower plant as case study, we established the relationship between failure of surrounding rock under high geo-stress condition and strength-to-stress ratio. Firstly the engineering geological conditions, inclusive of lithology, rock strength, and initial geostress, are summarized, and the types, quantities, and locations of failures during cavern group construction are statistically analyzed; then the surrounding rocks of underground caverns are partitioned according to strength-to-stress ratio. Moreover, in the light of the surrounding rock failure characteristics, the applicability of geostress grading standard modified based on the strength-to-stress ratio is verified, and the variation law of stress-induced failure of surrounding rock with strength-to-stress ratio is revealed. The research findings are conducive for the prediction of failure type of surrounding rocks of large-scale underground hard rock cavern group, and offer reference for targeted stability control measures.
[16]
蒋中明, 刘宇婷, 陆希, 等. 压气储能内衬硐室储气关键问题与设计要点评述[J]. 岩土力学, 2024, 45(12):3491-3509.
(Jiang Zhongming, Liu Yuting, Lu Xi, et al. Review on key scientific and design issues of lined rock caverns for compressed air energy storage[J]. Rock and Soil Mechanics, 2024, 45(12):3491-3509. (in Chinese))
[17]
蒋中明, 石兆丰, 杨雪, 等. 聚氨酯类聚合物砂浆-混凝土界面黏结性能与变形特征试验研究[J]. 岩土力学, 2024, 45(12):3545-3554.
(Jiang Zhongming, Shi Zhaofeng, Yang Xue, et al. Experimental study on bonding properties and deformation characteristics of polyurethane polymer mortar-concrete interface[J]. Rock and Soil Mechanics, 2024, 45(12): 3545-3554. (in Chinese))
[18]
夏才初, 秦世康, 赵海鸥, 等. 循环热力作用下压气储能洞室钢衬的疲劳耐久性[J]. 同济大学学报(自然科学版), 2023, 51(10): 1564-1573.
(Xia Caichu, Qin Shikang, Zhao Haiou, et al. Fatigue durability of steel lining in compressed air energy storage caverns under cyclic thermomechanical effects[J]. Journal of Tongji University (Natural Science), 2023, 51(10): 1564-1573. (in Chinese))
[19]
蒋中明, 杨雪, 石兆丰, 等. 柔性聚合物砂浆物理力学与密封性能研究[J]. 岩土工程学报, 2026, 48(3): 487-497.
(Jiang Zhongming, Yang Xue, Shi Zhaofeng, et al. Study on physical-mechanical and sealing performance of flexible polymer mortar[J]. Chinese Journal of Geotechnical Engineering, 2026, 48(3): 487-497. (in Chinese))
[20]
周瑜, 夏才初, 周舒威, 等. 压气储能内衬洞室高分子密封层的气密与力学特性[J]. 岩石力学与工程学报, 2018, 37(12): 2685-2696.
(Zhou Yu, Xia Caichu, Zhou Shuwei, et al. Air tightness and mechanical characteristics of polymeric seals in lined rock caverns(LRCS) for compressed air energy storage(CAES)[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(12): 2685-2696. (in Chinese))
[21]
Johansson J. High pressure storage of gas in lined rock caverns-cavern wall design principles[D]. Stockholm: Royal Institute of Technology, 2003.
[22]
Nishimoto Y, Tobase T, Hori M, et al.In-situ chamber tests for underground compressed-air storage facilities[C]// International Society for Rock Mechanics.Proceedings of the EUROCK96, Torino,September 2, 1996: 999-1006.
[23]
傅丹, 胡小康, 伍鹤皋, 等. 压气储能地下洞室密封钢衬的非线性力学响应特征[J]. 水力发电, 2024, 50(5): 38-44, 92.
(Fu Dan, Hu Xiaokang, Wu Hegao, et al. Characteristics of nonlinear mechanical response of sealing steel lining in underground high pressure air storage caverns[J]. Water Power, 2024, 50(5): 38-44, 92. (in Chinese))
[24]
蒋中明, 甘露, 张登祥, 等. 压气储能地下储气库衬砌裂缝分布特征及演化规律研究[J]. 岩土工程学报, 2024, 46(1): 110-119.
(Jiang Zhongming, Gan Lu, Zhang Dengxiang, et al. Distribution characteristics and evolution laws of liner cracks in underground caverns for compressed air energy storage[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(1): 110-119. (in Chinese))
[25]
张世殊, 徐国庆, 夏才初, 等. 压气储能地下洞室二衬预设缝参数优化研究[J]. 岩土力学, 2025, 46(10):3208-3218.
(Zhang Shishu, Xu Guoqing, Xia Caichu, et al. Optimization of preset crack parameters of secondary lining concrete in compressed air energy storage chamber[J]. Rock and Soil Mechanics, 2025, 46(10): 3208-3218. (in Chinese))
[26]
张国华, 相月, 王薪锦, 等. 压气储能地下内衬储气库结构荷载分担解析解及影响因素分析[J]. 岩石力学与工程学报, 2024, 43(增刊2): 3633-3650.
(Zhang Guohua, Xiang Yue, Wang Xinjin, et al. Analytical solution for load sharing in the structure of an underground lined rock cavern for compressed air energy storage and analysis of influencing factors[J]. Chinese Journal of Rock Mechanics and Engineering, 2024, 43(S2): 3633-3650. (in Chinese))
[27]
GB 50487—2008 水利水电工程地质勘察规范[S].
(GB 50487—2008 Code for engineering geological invcstigation of water resources and hydropower[S]. (in Chinese))
[28]
丛宇, 孔亮, 郑颖人, 等. 混凝土材料剪切强度的试验研究[J]. 混凝土, 2015(5): 40-45.
(Cong Yu, Kong Liang, Zheng Yingren, et al. Experimental study on shear strength of concrete[J]. Concrete, 2015(5): 40-45. (in Chinese))
[29]
刘英, 于立宏. Mohr-Coulomb屈服准则在岩土工程中的应用[J]. 世界地质, 2010, 29(4): 633-639.
(Liu Ying, Yu Lihong. Application of mohr-coulomb yield criterion in geo-technical engineering[J]. World Geology, 2010, 29(4): 633-639. (in Chinese))
[30]
GB 50017—2017 钢结构设计标准[S].
(GB 50017—2017 Standard for design of steel structures[S]. (in Chinese))
[31]
万发, 蒋中明, 李海峰, 等. CAES储气库衬砌开裂对裂隙围岩两相渗流和传热特性的影响[J]. 长江科学院院报, 2023, 40(11):102-110.
Abstract
为研究压气储能(CAES)储气库衬砌密封层开裂对裂隙围岩的两相渗流和传热特性的影响,基于COMSOL平台,利用弱形式PDE二次开发了双重介质两相渗流计算程序,并进行了验证。以某CAES储气库为背景,建立了储气库裂隙岩体两相渗流传热数值模型,研究了充放气过程中衬砌开裂对裂隙围岩的两相渗流和传热特性的影响。结果表明:① 衬砌开裂会使围岩裂隙和孔隙内渗流压力升高,同时导致裂隙和孔隙之间的渗流压力差增大,最大压差增大1.5 MPa。② 运行210 d后,衬砌开裂将导致渗漏的气体水平扩散范围由无开裂的54 m扩大至66.7 m。③ 初次充放气条件下,衬砌内外侧温差大,有可能超过100 K;衬砌开裂和围岩裂隙对衬砌和围岩温度分布影响微弱。因此衬砌开裂会造成渗流压力扩散,但对温度分布影响微弱。
(Wan Fa, Jiang Zhongming, Li Haifeng, et al. Impact of lining cracking of compressed air energy storage cavern on two-phase seepage and heat transfer characteristics of fractured surrounding rock[J]. Journal of Changjiang River Scientific Research Institute, 2023, 40(11): 102-110. (in Chinese))
[32]
陈尧, 伍鹤皋, 傅丹, 等. 地下储气洞室钢衬抗外压加劲环的布置方式研究[J]. 水电能源科学, 2025, 43(1): 217-220, 211.
(Chen Yao, Wu Hegao, Fu Dan, et al. Arrangements of anti-external pressure stiffeners on steel lining of underground air storage caverns[J]. Water Resources and Power, 2025, 43(1): 217-220, 211. (in Chinese))
[33]
NB/T 35056—2015 水电站压力钢管设计规范[S].
(NB/T 35056—2015 Design code for steel penstocks of hydroelectric stations[S]. (in Chinese))
[34]
谭平, 徐凯, 王斌, 等. 基于新型简易隔震支座的村镇建筑隔震性能研究[J]. 土木工程学报, 2013, 46(5): 64-70.
(Tan Ping, Xu Kai, Wang Bin, et al. Performance study of isolated rural buildings using novel simple isolators[J]. China Civil Engineering Journal, 2013, 46(5): 64-70. (in Chinese))
PDF(3917 KB)

Accesses

Citation

Detail

Sections
Recommended

/

〈 〉