Methodology and Effectiveness of Discharge Curve Calibration of Low-head Hydraulic Projects

HUANG Yan-qin, GU Jia-li, YAO Hong-liang, CHEN Duan, HAN Ji-bin, WANG Zhi-xin

Journal of Changjiang River Scientific Research Institute ›› 2025

PDF(630 KB)
PDF(630 KB)
Journal of Changjiang River Scientific Research Institute ›› 2025 DOI: 10.11988/ckyyb.20250249

Methodology and Effectiveness of Discharge Curve Calibration of Low-head Hydraulic Projects

Author information +
History +

Abstract

Based on the analysis of the causes for the discrepancies, a calibration method combining hydraulic calculation, prototype observation and numerical simulation, is proposed in order to deal with the inaccuracy of the design discharge curve. Taking a certain navigation and hydropower hub in the middle reach of the Ganjiang River as an example, prototype observation of flow rate was carried out for both flood discharge and power generation conditions. The discharge curves of the sluice are calibrated using prototype data, hydraulic calculations and three-dimensional CFD numerical simulations. The discharge curves adaptable to the changing boundary conditions are obtained for both controlled and uncontrolled flood discharge operations. It is shown that calculated power discharge is rather accurate, and the result can be used to separate power discharge and flood discharge from the total outbound flow. Calibrated discharge curves agree well with the prototype observation with deviations less than 5%, thus ready-to-use for the hub dispatching and operation. The present study can offer a reference for the analysis and calibration of the discharge curves in similar hydraulic projects.

Key words

sluice / discharge curve / prototype observation / numerical simulation / low-head hydraulic project

Cite this article

Download Citations
HUANG Yan-qin , GU Jia-li , YAO Hong-liang , et al . Methodology and Effectiveness of Discharge Curve Calibration of Low-head Hydraulic Projects[J]. Journal of Changjiang River Scientific Research Institute. 2025 https://doi.org/10.11988/ckyyb.20250249

References

[1]
华子平. 对淹没宽顶堰泄流能力计算公式的探讨[J]. 河海大学学报, 1998, 26(3): 97-101.
(HUA Zi-ping. A Calculating Formula for Spillway Capacity of Drowned Wide-crest Weirs[J]. Journal of Hohai University, 1998, 26(3): 97-101. (in Chinese))
[2]
张绪进, 樊卫平, 张厚强. 低闸枢纽泄流能力研究[J]. 水利学报, 2005, 36(10): 1246-1251.
(ZHANG Xu-jin, FAN Wei-ping, ZHANG Hou-qiang. Discharge Capacity of Low Head Sluice[J]. Journal of Hydraulic Engineering, 2005, 36(10): 1246-1251. (in Chinese))
[3]
穆祥鹏, 陈文学, 崔巍, 等. 弧形闸门流量计算方法的比较与分析[J]. 南水北调与水利科技, 2009, 7(5): 20-22.
(MU Xiang-peng, CHEN Wen-xue, CUI Wei, et al. Comparison and Analysis of Discharge Calculation Methods of Radial Gates[J]. South-to-North Water Transfer and Water Science & Technology, 2009, 7(5): 20-22. (in Chinese))
[4]
袁新明, 邓继军, 祁国军. 高淹没度下平底宽顶堰流量计算问题探讨[J]. 水利水电科技进展, 2010, 30(4): 22-24.
(YUAN Xin-ming, DENG Ji-jun, QI Guo-jun. Problems in Discharge Calculation of Broad-crested Weirs with Flat Bottom under High Submerged Flows[J]. Advances in Science and Technology of Water Resources, 2010, 30(4): 22-24. (in Chinese))
[5]
程锐, 赵建平.低水头弧形闸门淹没孔流流量计算分析研究[C]//2022中国水利学术大会论文集(第二分册). 北京: 黄河水利出版社, 2022: 560-565.
(CHENG Rui, ZHAO Jian-ping. Analysis of Flow Rate Calculation of Low Head Radial Gates with Submerged Partial Opening[C]// Proceedings of 2022 China Water Academic Congress. Beijing: The Yellow River Water Conservancy Press, 2022: 560-565. (in Chinese ))
[6]
田向忠, 张黄胜. 白莲崖水库泄洪设施泄流能力分析研究[J]. 江淮水利科技, 2023, (4): 19-24.
(TIAN Xiang-zhong, ZHANG Huang-sheng. Analysis and Research on the Discharge Capacity of Flood Discharge Facilities of Bailianya Reservoir[J]. Jianghuai Water Resources Science and Technology, 2023, (4): 19-24. (in Chinese ))
[7]
陈清, 陈士永. 基于水量平衡的洋口电站泄洪闸门泄流曲线复核[J]. 人民珠江, 2018, 39(10): 102-106.
(CHEN Qing, CHEN Shi-yong. Calibration of Floodgate Discharge Curve of Yangkou Hydropower Station Based on Water Balance[J]. Pearl River, 2018, 39(10): 102-106. (in Chinese))
[8]
陈其远. 利用区间流量修正紧水滩电站闸门泄流曲线[J]. 中国水能及电气化, 2014, (3): 18-23.
(CHEN Qi-yuan. Utilization of Interval Flow in Correcting Jinshuitan Power Station Sluice Discharge Curve[J]. China Water Power & Electrification, 2014, (3): 18-23. (in Chinese ))
[9]
丁义. 表孔局部开启泄流能力曲线计算方法的改进研究[J]. 人民长江, 2016, 47(8): 73-75.
(DING Yi. Improvement of Calculation Method of Discharge Capacity Curve with Partial Opening of Surface Outlets: Case of Jinping Hydropower Station[J]. Yangtze River, 2016, 47(8): 73-75. (in Chinese))
[10]
刘和咏, 王伟, 胡晨贺, 等. 基于关系曲线和水力学法的泄洪闸门泄流曲线率定[J]. 水电与抽水蓄能, 2018, 4(1): 99-103.
(LIU He-yong, WANG Wei, HU Chen-he, et al. Based on the Relation Curve and Hydraulic Method Flood Gate Discharge Rate Curve[J]. Hydropower and Pumped Storage, 2018, 4(1): 99-103. (in Chinese))
[11]
蔡界清, 陈川建. 走航式ADCP测流在重庆狮子滩水库泄流曲线复核中的应用[J]. 水利水电快报, 2019, 40(4): 22-26.
(CAI Jie-qing, CHEN Chuan-jian. Application of Navigational ADCP Flow Measurement on Validation of Discharge Curve of Shizitan Reservoir in Chongqing[J]. Express Water Resources & Hydropower Information, 2019, 40(4): 22-26. (in Chinese))
[12]
李蔚, 郝学宁, 王保申. 刘家道口节制闸泄流曲线研究[J]. 山东水利, 2012, (9): 5-7.
(LI Wei, HAO Xue-ning, WANG Bao-shen. Study on Discharge Curve of Liujiadaokou Regulating Gate[J]. Shandong Water Resources, 2012, (9): 5-7. (in Chinese ))
[13]
杨峰. 泄洪建筑物泄流能力复核的探讨[J]. 河北水利, 2000, (2): 42-43.
(YANG Feng. Discussion on Validation of Discharge Capacity of Flood Discharge Structures[J]. Hebei Water Resources, 2000, (2): 42-43. (in Chinese ))
[14]
王智欣, 聂头龙, 黄勇, 等. 变化环境下航电枢纽泄流曲线差异成因及率定方法[J/OL]. 水力发电, 2025.
(WANG Zhi-xin, NIE Tou-long, HUANG Yong, et al. Cause for Discrepancies and Calibration Method of the Discharge Curve of Navigation-Hydropower Junctions under Changing Environment[J/OL]. Water Power, 2025. (in Chinese ))
[15]
SL 265-2016, 水闸设计规范[S]. 北京: 中国水利水电出版社, 2016.
(SL 265-2016, Design Specification for Sluice[S]. Beijing: China Water & Power Press, 2016. (in Chinese ))
[16]
赵建均. 江西省赣江新干航电枢纽工程枢纽泄水闸断面模型试验报告[R]. 南京: 南京水利科学研究院, 2013.
(ZHAO Jian-jun. Report of Section Model Test for Sluice of Xingan Navigation and Hydropower Hub on the Ganjiang River in Jiangxi Province[R]. Nanjing: Nanjing Hydraulic Research Institute, 2013. (in Chinese ))
PDF(630 KB)

Accesses

Citation

Detail

Sections
Recommended

/