Optimizing Foundation Pit Dewatering Scheme of Fenghuangjing Pump Station of Diversion Project from Yangtze River to Huaihe River

ZHANG Guo-long, FAN Yue, ZHANG Wei, WANG Xiao, WANG Jin-long

Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (3) : 111-117.

PDF(5481 KB)
PDF(5481 KB)
Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (3) : 111-117. DOI: 10.11988/ckyyb.20211394
ROCK-SOIL ENGINEERING

Optimizing Foundation Pit Dewatering Scheme of Fenghuangjing Pump Station of Diversion Project from Yangtze River to Huaihe River

  • ZHANG Guo-long1, FAN Yue2, ZHANG Wei2, WANG Xiao2, WANG Jin-long2
Author information +
History +

Abstract

The dewatering for foundation pit of sluice station is a significant and complicated issue. The water inflow volume of the foundation pit of Fenghuangjing Pump Station reconstruction for the diversion project from Yangtze River to Huaihe River was calculated using both the “large well method” and the numerical simulation method. The dewatering scheme was optimized via 3D seepage simulation, and the influences of the spatial arrangement of dewatering wells and the well depth change on the dewatering effect were compared and analyzed. A dewatering scheme was finally recommended in consideration of both economy and construction convenience. Under the premise that the dewatering meets the requirements of depth, the more uniform the spatial distribution of dewatering wells, the smaller gap between the pumping volumes of each well, the more conducive to unified pump allotment. Arranging the dewatering wells around the foundation pit and avoiding the layout of wells inside the foundation pit can reduce the interference to the construction, but can also raise the total pumping capacity. The greater the depth of the dewatering well, the greater the total pumping amount, and the fewer the number of dewatering wells that need to be arranged.

Key words

foundation pit dewatering / dewatering well / diversion project from Yangtze River to Huaihe River / large well method / numerical simulation / Fenghuangjing Pump Station

Cite this article

Download Citations
ZHANG Guo-long, FAN Yue, ZHANG Wei, WANG Xiao, WANG Jin-long. Optimizing Foundation Pit Dewatering Scheme of Fenghuangjing Pump Station of Diversion Project from Yangtze River to Huaihe River[J]. Journal of Changjiang River Scientific Research Institute. 2022, 39(3): 111-117 https://doi.org/10.11988/ckyyb.20211394

References

[1] 吴吉春,薛禹群.地下水动力学[M].北京:中国水利水电出版社,2009.
[2] 张 伟,许季军,陈劲松.江口水电站坝址区三维渗流计算分析[J].长江科学院院报,2002,19(2):31-33.
[3] 骆祖江,李 朗,曹惠宾,等.复合含水层地区深基坑降水三维渗流场数值模拟:以上海环球金融中心基坑降水为例[J].工程地质学报,2006,14(1):72-77.
[4] 陈华勇,吴昌瑜,丁金华,等.深基坑降水方案选择中的多目标模糊决策[J].长江科学院院报,2008,25(6):86-89.
[5] 张 伟,定培中,肖 利,等.渠道深基坑降水试验及工程应用[J].长江科学院院报,2011,28(10):127-133.
[6] WANG J X, FENG B, LIU Y,et al. Controlling Subsidence Caused by Dewatering in a Deep Foundation Pit[J]. Bulletin of Engineering Geology and the Environment, 2012, 71(3): 545- 555.
[7] 吴 锐,刘文远,王耀忠,等. 某过江隧道南线工程降水方案研究[J].长江科学院院报,2013,30(10):77-80.
[8] 王康达,童立元,王占生,等.考虑围护结构影响的深基坑降压井布置方案优化[J].岩土工程学报,2014,36(增刊2):259-264.
[9] 崔永高.深厚强透水含水层超大基坑降水群井效应研究[J].工程地质学报,2015,23(3):574-579.
[10]游 洋,阎长虹,刘 实,等. 复杂地质条件下某深大基坑降水方案优化设计[J].工程地质学报,2017,25(3):715-722.
[11]吴昌瑜,李思慎,谢 红.深基坑开挖中的降水设计问题[J].岩土工程学报,1999,21(3):92-94.
[12]周志芳,郭耿新,钟建驰,等.深基坑降水设计中几个问题的讨论[J].勘察科学技术,2004(5):16-20.
[13]李再兴,梁 杏,郭付三,等.大井法在基坑涌水量计算中的应用[J].人民长江,2009,40(15):50-52,55.
[14]石中平. 基坑出水量计算方法探讨:“面井法”[J].水文地质工程地质, 2012,39(3):13-16,29.
[15]刘汉东,朱 华,王东东,等.大井法分段降水设计在南水北调中线工程中的应用[J].华北水利水电大学学报(自然科学版),2014,35(5):24-27,32.
[16]贺 翀,金芸芸.悬挂式降水基坑涌水量的源汇计算方法[J].隧道与地下工程灾害防治,2020,2(1):91-96.
[17]GB 50296—2014,管井技术规范[S]. 北京:中国计划出版社,2015.
PDF(5481 KB)

Accesses

Citation

Detail

Sections
Recommended

/