Method of Evaluating the Necessity of Graded Maintenance for Sick and Hazardous Open Channels

RAO Xi-bao, DING Jin-hua, YANG Xu-hui

Journal of Changjiang River Scientific Research Institute ›› 2021, Vol. 38 ›› Issue (10) : 82-87.

PDF(1296 KB)
PDF(1296 KB)
Journal of Changjiang River Scientific Research Institute ›› 2021, Vol. 38 ›› Issue (10) : 82-87. DOI: 10.11988/ckyyb.20210661
ENGINEERING SAFETY AND DISASTER PREVENTION

Method of Evaluating the Necessity of Graded Maintenance for Sick and Hazardous Open Channels

  • RAO Xi-bao1, DING Jin-hua1, YANG Xu-hui2
Author information +
History +

Abstract

Water works in China has entered an era of maintenance and management of hazards. Graded evaluation and repair for sick and hazardous water works conforms to the green and sustainable development concept and is conducive to improve the management level. In consideration of influential factors in five aspects as hazard degree, maintenance level, reparation technology feasibility, reparation cost, and hazard occurrence time, we analyzed the weights of each influential factor via expert judgment and order relation analysis method. The weight coefficient of hazard degree is the largest, followed by that of reparation technology feasibility and maintenance level in sequence. The occurrence time of hazard has the smallest weight. On this basis, we obtained the reparation necessity index (RNI), by which the necessity of maintenance and reparation can be evaluated.

Key words

water project management / canal project / graded maintenance / analysis of order relation / hazard degree

Cite this article

Download Citations
RAO Xi-bao, DING Jin-hua, YANG Xu-hui. Method of Evaluating the Necessity of Graded Maintenance for Sick and Hazardous Open Channels[J]. Journal of Changjiang River Scientific Research Institute. 2021, 38(10): 82-87 https://doi.org/10.11988/ckyyb.20210661

References

[1] 中华人民共和国水利部. 2019年全国水利发展统计公报[EB/OL]. (2021-04-27)[2021-07-01]. http://www.mwr.gov.cn/sj/tjgb/slfztjgb/202104/t20210427_1516456.html.
[2] 杜效鹄. 中国水坝安全状况分析与研究[J]. 水力发电, 219, 45(2):64-69,73.
[3] 童克强,阮 彤,方宗明,等. 中小型水工程施工建设及病害防治监理研究[J]. 长江科学院院报, 2012, 29(11):122-126.
[4] 中华人民共和国水利部. 水利监督月报[EB/OL]. (2020-10-19)[2021-07-01]. http://sljd.mwr.gov.cn/jctt/202010/P020201019386284535252.pdf.
[5] 中华人民共和国国务院.国新办举行病险水库除险加固国务院政策例行吹风会[EB/OL]. (2020-11-30)[2021-07-01].http://www.mwr.gov.cn/hd/zxft/fbh20201130/.
[6] 刘 宁. 对中国水工程安全评价和隐患治理的认识[J]. 中国水利, 2005(22):8-12.
[7] 中华人民共和国水利部,中华人民共和国财政部. 水利工程维修养护定额标准(试点)[EB/OL]. (2004-06-08)[2021-07-01].http://www.jsgg.com.cn/Index/Display.asp?NewsID=11737.
[8] 苏 铁,张希芳,张建怀. 《水利工程维修养护定额标准》编制方法研究[J].人民黄河, 2005,27(11):10-12.
[9] 易晶萍, 李 飞,胡春燕,等. 中国水工程安全与病害防治技术丛书8:病害水工程维护与管理 [M]. 北京:中国水利水电出版社, 2009.
[10] GB/T 50600—2020,渠道防渗衬砌工程技术标准[S]. 北京:中国计划出版社, 2020.
[11] SL 252—2017,水利水电工程等级划分及洪水标准[S]. 北京:中国水利水电出版社, 2017.
[12] 王 迪. 我国大型灌区结构组成分析及现代化评价研究[D]. 河北:河北农业大学, 2014.
[13] 香赵政,廖开际,刘其辉. 基于序关系确定成熟度评价指标权重的简易法[J]. 广西大学学报:自然科学版, 2009,34(6):823-826.
[14] 郭亚军.综合评价理论、方法及应用[M]. 北京:科学出版社,2007.
PDF(1296 KB)

Accesses

Citation

Detail

Sections
Recommended

/