Causes and Preventive Measures of Water Level Drawdown Downstream Near the Dam Site of Xinglong Hydrojunction Project on Hanjiang River

HUANG Jian-cheng, HUANG Xue-ying, ZHOU Yin-jun, GAO Yu

Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (7) : 13-16.

PDF(5872 KB)
PDF(5872 KB)
Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (7) : 13-16. DOI: 10.11988/ckyyb.20210559
RIVER-LAKE PROTECTION AND REGULATION

Causes and Preventive Measures of Water Level Drawdown Downstream Near the Dam Site of Xinglong Hydrojunction Project on Hanjiang River

  • HUANG Jian-cheng1, HUANG Xue-ying2, ZHOU Yin-jun1, GAO Yu1
Author information +
History +

Abstract

Since the Xinglong Hydrojunction Project on Hanjiang River was put into operation in 2013,the water level in the middle and dry seasons downstream near the dam site has decreased to varying degrees compared to that before the construction of the dam. By 2018,the dry water level has dropped by 1.67 m to the maximum,resulting in insufficient water depth of the ship lock threshold and affecting the smooth passage of ships. Having analyzed the measured hydrology,geology,and riverbed topography data of the river segment,we looked into the causes and preventive measures of the water level drawdown. Results reveal that the downward erosion and widening of flat riverbed induced by the discharge of clear water and the easily eroded riverbed sand are main causes of the drop of middle and low water levels in the downstream of dam site. We propose some engineering measures such as protecting the bottom of flat beach channel in the downstream near the dam site and constructing submerged dams to prevent riverbed from erosion and to appropriately raise the low water level of the river channel. In the meantime,we recommend to construct water diversion project from the Yangtze River to the Hanjiang River as soon as possible to increase the flow of water in the middle and lower reaches of the Hanjiang River in low water period in the purpose of fundamentally solving the problem of ships passing the gate and the adverse impacts caused by the water level drawdown.

Key words

water level / downstream near the dam site / river bed scour / preventive and control measures / Xinglong Hydrojunction Project

Cite this article

Download Citations
HUANG Jian-cheng, HUANG Xue-ying, ZHOU Yin-jun, GAO Yu. Causes and Preventive Measures of Water Level Drawdown Downstream Near the Dam Site of Xinglong Hydrojunction Project on Hanjiang River[J]. Journal of Changjiang River Scientific Research Institute. 2022, 39(7): 13-16 https://doi.org/10.11988/ckyyb.20210559

References

[1] 潘庆燊.长江中下游河道整治研究[M].北京:中国水利水电出版社,2011.
[2] 潘庆燊.长江水利枢纽工程泥沙研究[M].北京:中国水利水电出版社,2003.
[3] 长江勘测规划设计有限公司.南水北调中线工程汉江兴隆水利枢纽初步设计报告[R].武汉:长江勘测规划设计有限公司,2011.
[4] 冉 曦,张洪霞,连雷雷,等.丹江口大坝下游河道20世纪90年代演变规律分析[C] //第十届全国泥沙基本理论研究学术讨论会论文集.北京:中国水利水电出版社,2017.
[5] 张瑞瑾,谢鉴衡,王明甫,等.河流泥沙动力学[M].北京:中国水利水电出版社,1989.
[6] 长江水利委员会水文局.南水北调中线工程兴隆水利枢纽完工验收报告(水文篇)[R].武汉:长江水利委员会水文局,2019.
[7] 长江水利委员会水文局三峡水文水资源勘测局.宜昌东艳路过江通道工程水文分析计算专题研究报告[R].宜昌:长江水利委员会水文局三峡水文水资源勘测局,2021.
[8] 黄建成,陈义武,徐海涛,等.南水北调中线工程汉江兴隆水利枢纽泥沙模型试验研究报告[R].武汉:长江科学院,2005.
[9] 黄建成,李会云,莫伟莉,等.葛洲坝枢纽下游壅水工程措施实体模型试验研究报告[R].武汉:长江科学院,2001.
PDF(5872 KB)

Accesses

Citation

Detail

Sections
Recommended

/