Modeling and Application of Joint Optimal Scheduling of Cascade Reservoirs on Yalong River and the Middle and Downstream of Jinsha River Ⅱ: Joint Optimal Dispatch Rules

ZHANG Hai-rong, YAO Hua-ming, TANG Zheng-yang, WU Bi-qiong, XIN Tian-qi

Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (9) : 38-42.

PDF(5394 KB)
PDF(5394 KB)
Journal of Changjiang River Scientific Research Institute ›› 2022, Vol. 39 ›› Issue (9) : 38-42. DOI: 10.11988/ckyyb.20210533
WATER RESOURCES

Modeling and Application of Joint Optimal Scheduling of Cascade Reservoirs on Yalong River and the Middle and Downstream of Jinsha River Ⅱ: Joint Optimal Dispatch Rules

  • ZHANG Hai-rong1, YAO Hua-ming1, TANG Zheng-yang1, WU Bi-qiong1, XIN Tian-qi2
Author information +
History +

Abstract

On the basis of our previous potential analysis, we further probed into the operation rules between different reservoirs and different cascades, gave the joint optimal scheduling diagram, and analyzed the sequences of water impoundment and discharging of involved power stations to improve the utilization efficiency of water resources. Results demonstrate that the release sequence of the reservoirs before flood season should be: Lianghekou-Longpan-Jinping I-Ertan-Xiangjiaba-Baihetan-Xiluodu-Wudongde. The overall water releasing idea is to give priority to the upstream reservoirs and keep the downstream power stations such as Xiluodu and Wudongde operating at high water level as far as possible to improve the overall power generation efficiency of the basin. The order of water storage in the reservoirs at the end of flood season should be: Jinping I-Longpan/Ertan-Lianghekou-Wudongde-Baihetan/Xiluodu-Xiangjiaba. The overall water storage idea is to release the flood control capacity of the upstream reservoirs to start storage on a priority basis so as to alleviate the flood control pressure in the downstream, and the storage in wet years should be delayed accordingly.

Key words

wate resources utilization efficiency / cascades on Yalong River / cascades on middle and lower Jinsha River / joint optimal scheduling rules / scheduling diagram

Cite this article

Download Citations
ZHANG Hai-rong, YAO Hua-ming, TANG Zheng-yang, WU Bi-qiong, XIN Tian-qi. Modeling and Application of Joint Optimal Scheduling of Cascade Reservoirs on Yalong River and the Middle and Downstream of Jinsha River Ⅱ: Joint Optimal Dispatch Rules[J]. Journal of Changjiang River Scientific Research Institute. 2022, 39(9): 38-42 https://doi.org/10.11988/ckyyb.20210533

References

[1] 方洪斌,王 梁,李新杰.水库群调度规则相关研究进展[J].水文,2017,37(1):14-18.
[2] 丁 毅,李安强,何小聪.以三峡水库为核心的长江干支流控制性水库群综合调度研究[J].中国水利,2013(13):12-16.
[3] 李安强,张建云,仲志余,等.长江流域上游控制性水库群联合防洪调度研究[J].水利学报,2013,44(1):59-66.
[4] 康 玲,周丽伟,李争和,等.长江上游水库群非线性安全度防洪调度策略[J].水利水电科技进展,2019,39(3):1-5.
[5] 张双虎,黄 强,黄文政,等.基于模拟遗传混合算法的梯级水库优化调度图制定[J].西安理工大学学报,2006(3):229-233.
[6] 郭旭宁,胡铁松,黄 兵,等.基于模拟-优化模式的供水水库群联合调度规则研究[J].水利学报,2011,42(6):705-712.
[7] 朱金峰,王忠静.考虑生态用水的水库群优化调度研究[J].水力发电学报,2012,31(5):71-76,89.
[8] 许子宽,全 琴,贾 凤,等.水库群联合调度规则研究[J].陕西水利,2019(5):7-9.
[9] 何小聪,丁 毅,李书飞.基于等比例蓄水的长江中上游三座水库群联合防洪调度策略[J].水电能源科学,2013,31(4):38-41.
[10] 黄 草,王忠静,鲁 军,等. 长江上游水库群多目标优化调度模型及应用研究Ⅱ:水库群调度规则及蓄放次序[J]. 水利学报, 2014(10):1175-1183.
[11] 骆光磊,周建中,赵云发,等.水库群运行的改进深度神经网络模拟方法[J].水力发电学报,2020,39(9):23-32.
[12] 谢蒙飞. 梯级水电站随机发电调度及调峰计划编制研究[D]. 武汉:华中科技大学, 2017.
[13] 郭旭宁,秦 韬,雷晓辉,等.水库群联合调度规则提取方法研究进展[J].水力发电学报,2016,35(1):19-27.
[14] 周 婷,戚王月,金菊良.水库群优化调度中的结构分析方法研究进展[J].长江科学院院报, 2020, 37(12):14-21,27.
PDF(5394 KB)

Accesses

Citation

Detail

Sections
Recommended

/