JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI ›› 2020, Vol. 37 ›› Issue (9): 160-164.DOI: 10.11988/ckyyb.20200571

• 2020 ANNUAL CONFERENCE (ACADEMIC SEMINAR) OF SURVEY SPECIALIZEDCOMMITTEE OF CHINESE HYDRAULIC ENGINEERING SOCIETY • Previous Articles     Next Articles

Selecting Tunnel Route in Consideration of Impact on Groundwater Environment

MU Hong-yuan, MI Jian, LI Shao-fei, LIU Xiao-ning   

  1. Geological Department, Yunnan Institute of Water & Hydropower Engineering Investigation, Design and Research, Kunming 650021, China
  • Received:2020-06-16 Revised:2020-07-08 Published:2020-09-01 Online:2020-09-25

Abstract: In order to alleviate the impact of Haidong tunnel construction in the water diversion project in central Yunnan Province on groundwater environment, we investigated into the hydrogeological characteristics of karst water system and the groundwater environment in the tunnel route area by comprehensive means inclusive of hydrogeological survey and mapping, prospecting and observation, as well as analytical and numerical approaches. We also optimized the route scheme of Haidong tunnel in consideration of its impact on groundwater environment, and recommend the line B scheme which has less impact on groundwater environment. The present research offers a reference for the selection and comparison of tunnel scheme for water diversion project.

Key words: water diversion project in central Yunnan Province, tunnel route selection, karst water system, hydrogeological characteristics, groundwater environment

CLC Number: