Rational Flood Season Staging and Limit Flood Levels of Cascade Reservoirs in Downstream Jinsha River

YU Yu-cong, LI Wen-qing, LIU Zhao, YANG Zhou, YOU Feng-hua

Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (9) : 39-44.

PDF(4409 KB)
PDF(4409 KB)
Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (9) : 39-44. DOI: 10.11988/ckyyb.20191511
FLOOD PREVENTION AND DISASTER REDUCTION

Rational Flood Season Staging and Limit Flood Levels of Cascade Reservoirs in Downstream Jinsha River

  • YU Yu-cong1,2, LI Wen-qing1,2, LIU Zhao2,3, YANG Zhou1,2, YOU Feng-hua1,2
Author information +
History +

Abstract

Determining flood season stages and corresponding water levels in flood season stages rationally could help coordinate the contradiction between flood control benefit and power generation benefit of reservoirs, and is also of great significance to give full play to flood control and power generation capacity of reservoirs and improve the utilization rate of flood resources in flood season. In this paper, the flood season of cascade reservoirs(Wudongde,Baihetan,Xiluodu,and Xiangjiaba) in the lower reaches of Jinsha River is divided into stages according to the incoming flood using the improved fuzzy set analysis method, and the staged limit water level of cascade reservoirs is determined through the mapping relationship between membership degree and flood control capacity. The stages and corresponding limit flood levels are revised with intertemporal sampling method. Research results reveal that the pre-flood season of cascade reservoirs in the lower reaches of Jinsha River is July 1-July 14, main flood season July 15-September 16, and post-flood season September 17-October 24. The reasonable limit flood level for the four reservoirs is 962 m, 800 m, 575 m and 374 m, respectively. The staged limit flood levels are verified through the flood process of different typical floods. The staging results obtained in this study and the phased limit flood level of each reservoir could improve the economic benefits of reservoirs' power generation under the premise of flood control safety, and enhance the utilization rate of flood resources in flood season.

Key words

flood season staging / limit flood level / water resources utilization / fuzzy set analysis / intertemporal sampling method / cascade reservoirs in downstream Jinsha River

Cite this article

Download Citations
YU Yu-cong, LI Wen-qing, LIU Zhao, YANG Zhou, YOU Feng-hua. Rational Flood Season Staging and Limit Flood Levels of Cascade Reservoirs in Downstream Jinsha River[J]. Journal of Changjiang River Scientific Research Institute. 2020, 37(9): 39-44 https://doi.org/10.11988/ckyyb.20191511

References

[1] 张 霞,武鹏林,祝雪萍.综合分期方法在陈家湾水库汛期分期中的应用[J].人民黄河,2019,41(2):54-58,63.
[2] JIANG H, WANG Z, YE A, et al. Hydrological Characteristic-based Methodology for Dividing Flood Seasons: An Empirical Analysis from China[J]. Environmental Earth Sciences, 2019, 78(14): 399.
[3] MO C, MO G, YANG Q, et al. A Quantitative Model for Danger Degree Evaluation of Staged Operation of Earth dam Reservoir in Flood Season and Its Application[J]. Water Science and Engineering, 2018, 11(1): 81-87.
[4] MO C, MO G, LIU P, et al. Reservoir Operation by Staging Due to Climate Variability[J]. Hydrological Sciences Journal, 2018, 63(6): 926-937.
[5] 莫崇勋,王大洋,朱新荣,等.Fisher最优分割法在澄碧河水库汛期分期中的应用[J].水力发电,2017,43(6):19-22,27.
[6] 王家彪,廖卫红,付晓杰,等.基于熵权法的万安水库汛期分期计算[J].水利水电技术,2018,49(1):36-41.
[7] 孙立志,朱成立,张巧玉,等.提高水库汛限水位研究[J].长江科学院院报,2011,28(3):15-19.
[8] 周如瑞,梁国华,周惠成,等.大伙房水库汛期分期研究[J].水资源与水工程学报,2013,24(6):145-148.
[9] 罗姗姗,宋星原,张艳军,等.汛期分期分析方法在佛子岭水库群的应用研究[J].水电能源科学,2012,30(2):44-48.
[10]郭 倩,刘 攀,徐高洪,等.基于汛期平均流量评价李庄洪水汛期分期研究[J].水力发电学报,2012,31(4):39-43.
[11]谭 幸,吴晓彬,虞 慧.水库汛期分期及分期汛限水位研究综述[J].江西水利科技,2017,43(1):23-26.
[12]舒章康,刘 冀,董晓华,等.基于模糊集合分析的汛期分期降雨极值分布研究[J].水力发电学报,2017,36(7):55-64.
[13]李 俊.基于改进模糊集分析法的汛期分期[J].长江科学院院报,2017,34(12):12-16.
[14]胡家露.水库汛期分期与汛限水位研究[D].武汉:华中师范大学,2015.
[15]吕玉洁.梯级水库汛期分期及汛限水位合理确定研究[D].西安:西安理工大学,2008.
[16]水利部长江水利委员会.长江流域防洪规划[R]. 武汉:水利部长江水利委员会,2008.
[17]LIU Zhao,LYU Jia-wei,JIA Zhi-feng,et al. Risks Analysis and Response of Forecast-based Operation for Ankang Reservoir Flood Control[J].Water,2019, 11(6): 1134.
PDF(4409 KB)

Accesses

Citation

Detail

Sections
Recommended

/