Risk Assessment Method for Standardized ManagementSystem of Dike Engineering

JIANG Shui-hua, HUANG Zhong-fa, JIANG Xian-he, WU Hai-zhen, HUANG Jin-song

Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (5) : 180-186.

PDF(4983 KB)
PDF(4983 KB)
Journal of Changjiang River Scientific Research Institute ›› 2020, Vol. 37 ›› Issue (5) : 180-186. DOI: 10.11988/ckyyb.20190043
CONSTRUCTION AND MANAGEMENT OF WATER CONSERVANCY PROJECTS

Risk Assessment Method for Standardized ManagementSystem of Dike Engineering

  • JIANG Shui-hua1, HUANG Zhong-fa1, JIANG Xian-he2, WU Hai-zhen3, HUANG Jin-song1
Author information +
History +

Abstract

A risk-based standardized management system of dike engineering is established by integrating the risk management theory with the work, technology, management and evaluation standardized systems of dike engineering. A risk assessment approach for the standardized management system is also proposed. The key dike projects in the Poyang Lake area are taken as typical cases. The standard maps of life, economic and environmental risks of dike engineering in China are determined at first. Subsequently, the risk matrix method is adopted to compute the assessment index coefficients for the life, economic and social environmental risks, respectively, and estimate the comprehensive assessment index coefficient. The risk-based standardized management scores of dike engineering are obtained through incorporating the comprehensive assessment index coefficient into the standardized evaluation management. Finally, the scores are used to evaluate whether the standardized management of dike engineering is qualified. The results indicate that the established standardized management system of dike engineering provides not only theoretical and technical supports for working out the scientific and rational failure risk management decisions and measures for dikes, but also references for operation management of other dike projects.

Key words

dike engineering / standardized management / risk management / risk standard / assessment index coefficient

Cite this article

Download Citations
JIANG Shui-hua, HUANG Zhong-fa, JIANG Xian-he, WU Hai-zhen, HUANG Jin-song. Risk Assessment Method for Standardized ManagementSystem of Dike Engineering[J]. Journal of Changjiang River Scientific Research Institute. 2020, 37(5): 180-186 https://doi.org/10.11988/ckyyb.20190043

References

[1] 陈 丹, 黄善和, 蒋伯杰, 等. 北江大堤标准化管理模式研究[J]. 广东水利水电, 2017(10): 53-56.
[2] 周兴波, 周建平, 杜效鹄, 等. 我国大坝可接受风险标准研究[J]. 水力发电学报, 2015, 34(1): 63-72.
[3] 郭秀霞. 菏泽市洙赵新河标准化堤防建设探讨[J]. 中国水利, 2012(4): 29-31.
[4] 陈 龙. 浙江省水利工程标准化管理的探索实践[J]. 中国水利, 2017(6): 15-17.
[5] VAN DER MEER J W, DE LOOFF A P, GLAS P. Integrated Approach on the Safety of Dikes along the Great Dutch Lakes[C]∥Proceedings of the 26th International Conference on Coastal Engineering. Copenhagen, Denmark. June 22-26, 1998: 3439-3452.
[6] HUI R, JACHENS E, LUND J. Risk-based Planning Analysis for a Single Levee[J]. Water Resources Research, 2016, 52(4): 2513-2528.
[7] 李 锋, 李宗坤. 基于未确知网络分析法的堤防工程风险分析研究[J]. 长江科学院院报, 2012, 29(7): 35-40.
[8] ZHANG L M, XU Y, LIU Y, et al. Assessment of Flood Risks in Pearl River Delta Due to Levee Breaching[J]. Georisk, 2013, 7(2): 122-133.
[9] TOBITA D, KAINUMA T. Quantification ofLevee Breach Volume Based on Levee Breach at the Chiyoda Experimental Flume[J]. Journal of JSCE, 2014, 2(1): 136-143.
[10]杨端阳,王超杰,郭成超,等. 堤防工程风险分析理论方法综述[J]. 长江科学院院报,2019,36(10):59-65.
[11]胡 韬, 李青云, 介玉新, 等. 长江堤防工程安全性综合评价系统开发[J]. 长江科学院院报, 2004, 21(3): 36-40.
[12]江西省水利工程标准化管理办公室.江西省堤防工程标准化管理考核评价标准(试行)[R]. 南昌:江西省水利工程标准化管理办公室, 2018.
[13]徐卫亚, 邢万波, 魏文白, 等. 堤防失事风险分析和风险管理研究[J]. 岩石力学与工程学报, 2006, 25(1): 47-55.
[14]李 雷, 王仁钟, 盛金保, 等. 大坝风险评价与风险管理[M]. 北京: 中国水利水电出版社. 2006.
[15]高延红, 张俊芝. 堤防工程风险评价理论及应用[M]. 北京: 中国水利水电出版社, 2011.
[16]丁 丽. 堤防工程风险评价方法研究[D]. 南京: 河海大学, 2006.
[17]郑卫东, 喻小宝, 谭忠富, 等. 改进的风险矩阵法在电力系统结构与电力设备设施综合风险评价中的应用[J]. 水电能源科学, 2014, 32(10): 189-193.
[18]黄中发, 黄浩智, 蒋水华, 等. 堤防工程系统风险因子量化及风险评价[J]. 自然灾害学报, 2018, 27(4): 171-177.
[19]纪伟涛, 等. 鄱阳湖:地形·水文·植被[M]. 北京: 科学出版社, 2017.
[20]韦鹏昌, 蒋水华, 江先河, 等. 考虑多破坏模式的堤防工程失事风险率分析[J]. 武汉大学学报(工学版), 2020, 53(1):9-15.
[21]DEKAY M L, MCCLELLAND G H. PredictingLoss of Life in Cases of Dam Failure and Flash Flood[J]. Risk Analysis, 1993, 13(2):193-205.
[22]梁艳红. 基于Mike Flood的中小河流溃堤洪灾风险分析[D]. 南昌: 南昌工程学院, 2017.
[23]梁艳洁, 余明辉, 魏红艳. 无粘性土堤漫顶溃决过程初步研究[J]. 四川大学学报(工程科学版), 2011, 43(5): 89-94.
[24]孙东亚, 解家毕, 姚秋玲. 堤防工程失事概率分析方法及溃决模式研究[J]. 中国防汛抗旱, 2010, 20(2): 25-28.
[25]邢万波. 堤防工程风险分析理论和实践研究[D]. 南京: 河海大学, 2006.