During hydropower project construction, various construction conflicts and interference pose different effects on the quality, safety and schedule of the project. In particular, the relations among period, space, and facilities of large-scale group construction are much more complicated. In order to analyze and solve these problems, we introduce the concept of space-time collision detection into hydropower engineering construction by integrating the 4D simulation and collision detection functions in BIM (Building Information Model), and propose the implementation methods and procedures of collision detection. We apply the space-time collision detection method to engineering projects like cavern group excavation and large-scale construction equipment installation and operation, and propose early warning and solutions to possible conflicts in the process of construction.
Key words
hydropower project construction /
BIM /
space-time collision detection /
excavation of tunnel group /
early warning
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 杜 训,陆惠民.建筑企业施工现场管理[M].北京:中国建筑工业出版社,1996.
[2] 夏大勇,熊 雄,朱洪强,等.龙滩水电工程大坝施工设备防碰撞预警系统的开发[J].红水河,2006,25(4):60-63.
[3] 张建平,范 喆,王阳利,等.基于和4D-BIM的施工资源动态管理与成本实时监控[J].施工技术,2011,40(4):37-40.
[4] 胡振中,张建平,张 新.基于四维时空模型的施工现场物理碰撞检测[J].清华大学学报(自然科学版),2010,50(6):820-825.
[5] 杨 科,康登泽,车传波,等.基于BIM的碰撞检查在协同设计中的研究[J].土木建筑工程信息技术,2013,5(4):71-75.