The high and steep slope of Rucheng-Chenzhou expressway is located between segment K65+410 and K65+680. Since March 2011, deep displacement had occurred in the slope in need of treatment measures. In this article, a slope model with multiple potential slip surfaces is built on the thorough understanding of the site's geological conditions and the deformation mechanisms. The slope stability under different conditions is calculated with the limit equilibrium method. On this basis, treatment measures are put forward, including cutting slope, surcharge reaction and anchor bolts. The results offer basis for the design of high-steep slope treatment.Within 4 years after the treatment, no large-scale deformation occurred, which indicates that the high-steep slope treatment is successful.
Key words
Rucheng-Chenzhou expressway /
high-steep slope /
multiple slip surfaces /
stability analysis /
treatment
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] SCHUSTER R L, HIGHLAND L M. Socioeconomic and Environmental Impacts of Landslides in the Western Hemisphere[R]. USA: United States Geological Survey, 2001.
[2] 曹 平,张 科,汪亦显,等. 复杂边坡滑动面确定的联合搜索法[J]. 岩石力学与工程报,2010, 29(4):814-821.
[3] 贲能慧. 复杂多滑动面重力坝坝基抗滑稳定分析和加固措施研究[D].南京:河海大学,2007.
[4] 陈善雄,戴张俊,陆定杰,等. 考虑裂隙分布及强度的膨胀土边坡稳定性分析[J]. 水利学报,2014,45(12):1442-1449.
[5] 尤明庆. 均质土坡的圆弧滑动分析[J]. 岩土力学,2008,29(8):2025-2032.
[6] 任伟中,金亚兵,冯光平,等. 滑(边)坡稳定性评估探讨[J]. 岩土力学,2010, 31(7):2129-2134.
[7] 美国陆军工程师团.岩土工程勘察规范[M]. 许仙娥译.郑州:黄河水利出版社, 2015.
[8] 肖先国,林依平,余 涛,等. Slide软件在边坡稳定性计算中的应用[J]. 交通科技,2012,(4):50-51,85.
[9] DZ/T 0218—2006,滑坡防治工程勘查规范[J]. 北京:中国标准出版社,2006.
[10] 徐开祥, 黄学斌, 付小林,等. 滑坡及危岩(崩塌)防治工程措施选择与工程设置[J]. 中国地质灾害与防治学报, 2005, 16(4):130-134.
Funding
国家自然科学青年基金项目(51008298)