In the preparation of structural surface model, cement mortar is poured into the model, and then structural surface specimen is placed directly on the flowing cement mortar, resulting in uneven settlement of the specimen. However, the structural surface model must be horizontal in direct shear test; otherwise the structural surface is not perpendicular to the vertical force of shear apparatus, which means that normal stress is not perpendicular to shear stress, leading to big error or even completely wrong result compared with the actual situation. In view of this, an instrument of preventing structural surface model from settlement in direct shear test of rock mass is proposed. The instrument consists of an outer frame, active pole, clamping plate, hook, wing nuts and so on. In preparing structural surface model, the specimen is clamped tight and fixed to secure it does not move, which avoids the uneven settlement and excessive subsidence.
Key words
direct shear test /
anti-settlement instrument /
model of structural surface of rock /
uneven settlement /
stability
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 邹宗兴,唐辉明,刘 晓. 制样误差对结构面直剪试验结果影响定量研究[J]. 岩石力学与工程学报,2010,29(8): 1664-1669.
[2] 童志怡,陈从新,徐 健.基于黏着摩擦理论的结构面抗剪强度选取方法[J].岩土工程学报,2008,30(9):1367-1371.
[3] 向 波,周立荣,马建林.基于岩体结构面分级的抗剪强度确定法[J].岩石力学与工程学报,2008,27(2):3547-3552.
[4] 刘明维,傅 华,吴进良.岩体结构面抗剪强度参数确定方法的现状及思考[J].重庆交通学院学报,2005,24(5):66-68.
[5] 颜育仁.岩体结构面抗剪强度经验估算方法的工程应用研究[D].杭州:浙江工业大学,2005.
[6] 徐 伟,吴建川,邹宗兴.一种消除直剪试验制模时误差角的调平夹尺[J].人民长江,2012,42(11):53-55.
[7] 徐 伟,倪化勇,徐如阁,等.直剪试验中结构面试样防沉降夹的研制[J].环境与安全工程,2014,21(1):125-128.