With rapid economic and social development and population growth, rail transit project construction increases obviously at flood detention basin near big city, but few reasearchers turn their eyes to the influence of rail transit on usage of flood detention basin. In view of this, we take rail transit No. 21 in Wuhan as an example. We apply dynamic boundary simulation technology and establish a two-dimensional water flow mathematical model for the flood detention basin to analyze the influence on the basin. Results show that effective flood detention volume occupied by bridge pier or railway station is relatively small in Wuhu flood detention basin. Furthermore, project construction has little influence on flood diversion discharge, duration, water level and flow field. It is the same for flood fall discharge,so project construction doesn’t have obvious adverse impact on the usage of flood detention basin. Finally, the research method and results can be taken as reference for design companies and autorities of flood prevention.
Key words
rail transit /
project construction /
flood detention basin /
mathematical model /
influence on flood diversion /
influence on flood fall
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 周孝德,陈惠君.滞洪区二维洪水演进及洪灾分析[J].西安理工大学学报,1996,12(3):244-250.
[2] 刘战友,韩民安,赵英虎.大黄堡洼蓄滞洪区洪水演进过程分析研究[J].水科学与工程技术,2012,(4):33-35.
[3] 魏 凯,梁忠民,王 军. 基于MIKE21的濛洼蓄滞洪区洪水演算模拟[J].南水北调与水利科技,2013,11(6):16-19.
[4] 段 扬,廖卫红,杨 倩,等. 基于EFDC模型的蓄滞洪区洪水演进数值模拟[J].南水北调与水利科技,2014,12(5):160-165.
[5] 张细兵,毛 冰.基于Google Earth的分蓄洪区水沙模拟与演示系统研究[J].长江科学院院报,2014,31(2):8-11.
[6] 长江水利委员会. 长江流域蓄滞洪区建设与管理规划报告[R].武汉:长江水利委员会,2012.
[7] 长江科学院. 武汉市轨道交通阳逻线(21号线)工程穿越武湖蓄滞洪区洪水影响评价报告[R].武汉:长江科学院,2015.