Cracks are very likely to occur due to complex loads endured by concrete spiral case during the operation of hydropower station. Seepage control design is hence a big problem needs focus. Owing to insufficient research of seepage control at present and more applications of concrete spiral case in low and middle and even high head power stations in the future, some seepage control measures for concrete spiral case were analyzed by nonlinear finite element method with a hydropower station in river channel as the research background. The research results indicate that high strength concrete, steel fiber-reinforced concrete and epoxy mortar materials could solve the cracking problem for the concrete spiral case structure, but they have some limitations in practice. Steel liner coating on the inner wall of concrete spiral case and pre-stressed reinforcement have good effect in dealing with seepage problem and they are recommended to be preferentially used in practical projects.
Key words
concrete spiral case /
nonlinear finite element method /
cracking restriction /
seepage control measures /
concrete damage
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 伍鹤皋,马善定,秦继章.大型水电站蜗壳结构设计理论与工程实践[M]. 北京: 科学出版社, 2009.
[2] 王 琛,栾远新,马 军. 聚丙烯纤维材料在尼尔基水电站混凝土蜗壳中的应用[J]. 东北水利水电, 2005, 23(7): 1-3,10.
[3] 佚 名. 高坝洲水电站水轮机预应力钢筋混凝土蜗壳结构研究与运用[J]. 科技进步与对策, 2001,18(10):176.
[4] 徐麟祥, 陈麟灿. 高坝洲水电站设计概述[J]. 水力发电, 2002,(3):19-20,31.
[5] 张运雄, 周华文, 孙志恒,等. 新安江大坝溢流面弹性环氧砂浆现场试验[J]. 大坝与安全, 2006,(2): 31-34.
[6] LEE J, FENVES G L. Plastic-damage Model for Cyclic Loading of Concrete Structures[J]. Journal of Engineering Mechanics, 1998, 124(8): 892-900.
[7] 伍鹤皋, 田海平, 李永祖. 水电站混凝土蜗壳三维有限元分析[J]. 武汉大学学报(工学版), 2007, 40(5):53-57.
[8] 向功兴, 杨亚军, 伍鹤皋,等. 河床式厂房止水布置和混凝土蜗壳座环柔度[J]. 武汉大学学报(工学版), 2010, 43(1): 46-50.