TBM (Tunnel Boring Machine) method and drilling and blasting method are two main methods in the excavation of underground projects. As for the two methods, disturbance range of surrounding rock, deformation and destruction characteristics, self-stability, and treatment measures are different. In order to accurately understand macroscopic mechanical characteristics of surrounding rock, we should analyze it at microscopic level. Diversion tunnel in JinpingⅡhydropower station ,with maximum embedded depth of 2 525 m, is taken as an example. We carry out tests of scanning electron microscope (SEM) and detect the depth of stress relaxation for marble tunnel under different excavation methods. The test results show that, 1) fracture surfaces of rock by scanning electron microscope in TBM method show pattern of wiping along crystal face and pattern of cutting crystal face, with shear failure as the main failure mechanism, whereas tensile failure for drilling and blasting method; 2) in the aspect of relaxation depth, stress-relaxation depths of surrounding rock excavated by drilling and blasting method are larger than those by TBM method, which vary from 40 cm to 100 cm. The research findings provide reference for failure mechanism of rock and reinforcement measures in projects with similar geological conditions.
Key words
TBM /
drilling and blasting method /
scanning electron microscope /
depth of stress relaxation /
failure mechanism /
reinforcement measures
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] RIBACCHI R, FAZIO A L. Influence of Rock Mass Parameters on the Performance of A TBM in A Gneissic Formation (Varzo Tunnel)[J]. Rock Mechanics and Rock Engineering, 2005, 38(2): 105-127.
[2] 王 华,吴 光.TBM施工隧道岩石耐磨性与力学强度相关性研究[J].水文地质工程地质,2010,37(5):57-61.
[3] 冷先伦,盛 谦,朱泽其,等.不同TBM驱动力下的围岩开挖扰动区研究[J].岩石力学与工程学报, 2009,28(2):3692-3698.
[4] 程兵瑞,冯夏庭,肖亚勋,等.在TBM开挖的深埋隧洞中岩石声发射测试的损伤演化规律[J].岩石力学与工程学报,2010,29(8):1562-1569.
[5] 陈 浩. TBM掘进效率与围岩相关性研究[D].成都:西南交通大学,2010.
[6] OGGERI C, INNAURATO N, ORESTE P P, et al. Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress Confinement[J]. Rock Mechanics and Rock Engineering, 2007, 40(5): 429-451.
[7] BILGIN N, DEMIRCIN M A, COPUR H, et al. Dominant Rock Properties Affecting the Performance of Conical Picks and the Comparison of Some Experimental and Theoretical Results[J]. International Journal of Rock Mechanics and Mining Sciences, 2006, 43(1): 139-156.
[8] FUKUI K, OKUBO S. Rock-properties Estimation by TBM Cutting Force[C]∥VOUILLE G, BEREST P. Proceedings of 9th International Congress on Rock Mechanics, Paris, France, August 25-28 , 1999:22-26.
[9]YAGIZ S.TBM Performance Prediction Based on Rock Properties[C]∥International Society for Rock Mechanics.Proceedings of the International Symposium of the International Society for Rock Mechanics, Liege, Belgium, May 9-12, 2006: 663-670.
[10]吴世勇,龚秋明,王 鸽,等.锦屏一级水电站深部大理岩板裂化破坏试验研究及其对TBM开挖的影响[J].岩石力学与工程学报,2010,29(6):1089-1095.
[11]苏华友,张继春.供水TBM隧洞监测与信息化施工[J].中国矿业,2003,12(7):30-33.
[12]杨 龙, 杜守继. 地铁隧道TBM施工围岩振动效应的数值分析[J]. 长江科学院院报,2014,31(7):60-64.
[13]李青松,石豫川,周春宏. 多元回归法在某水电站TBM施工隧洞围岩质量预测中的应用[J]. 长江科学院院报,2012,29(2):41-45.