Joint energy dissipation of stepped spillway and flaring gate pier was used in many projects, but the stepped surface damage was recently found in several projects. According to the model test and prototype measurement, the hydraulic parameters such as time average pressure, flow velocity near bottom and aeration concentration possibly affecting the damages of stepped surface under the action of nappe of flaring gate pier were analyzed. In the same time, the method of mechanics of materials was used to conduct force analysis of stepped concrete layers in association with fluctuating pressure and testing data of time average pressure. Results show that, under the conditions of stratifying of roller compacted concrete(RCC) and the damage of surface sealant , fluctuating pressure will act on concrete through surface fissures or interlayer fissures . Thus the maximum tensile stress will possibly occur and when it exceeds tensile strength of concrete, stepped concrete surface is possible to be harmed.
Key words
stepped concrete damage /
flaring gate pier /
flow velocity /
aeration concentration /
fluctuating pressure
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 尹进步,梁宗祥,龚红林.X宽尾墩应用与发展的试验研究[J].水力发电学报,2007,26( 4) : 36 -39.
[2] 何光同,曾宪康,李祖发.水东水电站新型消能工结构优化设计[J].水力发电,1994,(9):26-28.
[3] 林可冀,韩 立,邓毅国,等. 大朝山水电站RCC溢流坝宽尾墩、台阶式坝面联合消能工的研究及应用[J].云南水力发电,2002,(4):6-15.
[4] 梁宗祥,尹进步,卢 红,等.与宽尾墩联合使用的台阶面水流压强特性研究[J].长江科学院院报,2009,26(3):17-20.
[5] 梁宗祥,尹进步,卢 红,等.与宽尾墩联合使用的台阶面水流近底流速特性[J].人民黄河,2009,(8):79-81.
[6] 尹进步,梁宗祥,刘韩生.台阶溢流坝过流掺气减蚀问题的研究[J].长江科学院院报,2005,22(4):1-4.
[7] 刘沛清,刘心爱,李福田.消力池底板块的失稳破坏机理及其防护措施[J].水利学报,2001,(9):1-9.
[8] 谢卫生,黎 慧.止水破坏情况下的消力池护坦稳定分析[J].江西水利科技,2004,30(增刊):57-60.
[9] 李爱华,刘沛清.脉动压力在板块缝隙中传播衰变机理研究[J].水利水电技术,2006,37(9):33-37.