Research on Sequence of Prestressing Tension in Aqueduct Based onCharacteristic Parameters

WU Ze-yu,WANG Dong-wei

Journal of Changjiang River Scientific Research Institute ›› 2015, Vol. 32 ›› Issue (12) : 24-27.

PDF(1380 KB)
PDF(1380 KB)
Journal of Changjiang River Scientific Research Institute ›› 2015, Vol. 32 ›› Issue (12) : 24-27. DOI: 10.11988/ckyyb.20140546
WATERRESOURCESANDENVIRONMEN

Research on Sequence of Prestressing Tension in Aqueduct Based onCharacteristic Parameters

  • WU Ze-yu1,2,WANG Dong-wei3
Author information +
History +

Abstract

In order to obtain reasonable sequence of prestressing tension,we put forward a new way by using characteristic parameters to guide prestressing tension.Dynamic characteristics of rectangular aqueducts with rib and without rib,and U-shape aqueduct are respectively analyzed.The results show that,as for U-shape aqueduct,the vertical prestress and the circumferential prestress can obviously reduce the overall stiffness of the structure, but the prestressing effect does not change the order of mode of vibration.Through analyzing 6 kinds of sequence of prestressing tension for rectangular aqueduct without rib,we obtain a reasonable sequence:Firstly,prestress in the longitudinal direction is tensioned up to 40% of the maximum.Secondly,we tension the prestress in the vertical direction.Then,the rest of prestress in the longitudinal direction is tensioned.Finally,we tension the prestress in the transverse direction.This sequence of prestressing tension of rectangular aqueduct without rib can not only avoid the excessive influence of vertical prestress on the overall rigidity of the aqueduct,but also counteract the negative deflection due to gravity of the structure at early stage.Influence of this sequence of prestressing tension on mechanical properties of aqueduct is the smallest in comparison with other sequences.

Key words

characteristic parameter / aqueduct / prestress / tension sequence / dynamic properties

Cite this article

Download Citations
WU Ze-yu,WANG Dong-wei. Research on Sequence of Prestressing Tension in Aqueduct Based onCharacteristic Parameters[J]. Journal of Changjiang River Scientific Research Institute. 2015, 32(12): 24-27 https://doi.org/10.11988/ckyyb.20140546

References

[1] TAKABATAKE H.Effects of Dead Loads in Dynamic Plates[J].Structural Engineering,1990,118(1):34-51.
[2] TAKABATAKE H.Effects of Dead Loads in Static Bea-ms[J].Structural Engineering,1989,116(4):1102-1120.
[3] TAKABATAKE H.Effects of Dead Loads on Natural Frequencies of Beams[J].Structural Engineering,1991,117(4):1039-1120.
[4] TAKABATAKE H.Cantilevered and Linearly Tapered Thin-walled Members[J].Engineering Mechanics,1988,116(4):733-750.
[5] CLOUGH R W,PENZIEN J.Dynamics of Structures[M].Berkeley,California:Computers and Structures,1995:201-202.
[6] 季三荣,王东炜,赵 骞.基于模态分析的钢管脚手架平面支撑刚度研究[J].郑州大学学报(工学版),2010,31(4):31-35.(JI San-rong,WANG Dong-wei,ZHAO Qian.Stiffness Study of Pipe Scaffold Planar Support System by the Model Analysis[J].Journal of Zhengzhou University(Engineering Science),2010,31(4):31-35.(in Chinese))
[7] 王东炜,张奇伟,王用中.基于模态分析的鄄城黄河公路大桥优化设计[J].郑州大学学报(工学版),2010,31(6):1-5.(WANG Dong-wei,ZHANG Qi-wei,WANG Yong-zhong.Optimization Design of the Yellow River Main Bridge in Juancheng Based on the Researches on the Dynamic Characteristics[J].Journal of Zhengzhou University(Engineering Science),2010,31(6):1-5.(in Chinese))
[8] 张社荣,祝 青,李 升.大型渡槽数值分析中预应力的模拟方法[J].水利发电学报,2009,28(3):97-100.(ZHANG She-rong,ZHU Qing,LI Sheng.Simulation Methods of Prestress in Numerical Analysis of Large Aqueduct[J].Journal of Hydroelectric Engineering,2009,28(3):97-100.(in Chinese))
[9] 夏富洲,王长德,曹为民,等.大流量预应力渡槽设计与施工技术研究[J].南水北调与水利科技,2009,7(6):47-49.(XIA Fu-zhou,WANG Chang-de,CAO Wei-min,et al.Research on Design and Construction Technology for Large Flow Prestressed Concrete Aqueduct[J].South-to-North Water Transfers and Water Science & Technology,2009,7(6):47-49.(in Chinese))
[10]李俊宏,何淑媛,袁勤国.大型渡槽槽身施工技术进展[J].中国农村水利水电,2005,(10):61-63.(LI Jun-hong,HE Shu-yuan,YUAN Qin-guo.Development of Construction Technique of Large-sized Aqueduct Body[J].China Rural Water and Hydropower,2005,(10):61-63.(in Chinese))
PDF(1380 KB)

Accesses

Citation

Detail

Sections
Recommended

/