岩土工程

重庆市隧道工程地质环境负效应评价体系

  • 任秀文 ,
  • 彭海游 ,
  • 杨乐 ,
  • 尚红光 ,
  • 胡小军 ,
  • 冯樊
展开
  • 1.重庆中科勘测设计有限公司,重庆 400042;
    2. 重庆地质矿产研究院 a.外生成矿与矿山环境重庆市重点实验室;b.煤炭资源与安全开采国家重点实验室重庆研究中心,重庆 400042
任秀文(1984-),男,山西太原人,工程师,硕士,主要从事水文地质、工程地质及环境地质相关的研究工作,(电话)13527428860(电子信箱)704246529@qq.com。

收稿日期: 2015-09-21

  修回日期: 2015-11-20

  网络出版日期: 2016-07-25

基金资助

重庆市国土房管局2011年度地质灾害防治专项资金资助项目(120301)

System for Evaluating Geological Environment Negative Effect in Chongqing Tunnel Engineering Construction Process

  • REN Xiu-wen ,
  • PENG Hai-you ,
  • YANG Le ,
  • SHANG Hong-guang ,
  • HU Xiao-jun ,
  • FENG Fan
Expand
  • 1.Chongqing Zhongke Survey and Design Co., Ltd.,Chongqing 400042, China;
    2.Chongqing Key Laboratory of Exogenic Mineralization and Mine Environment, Chongqing Institute of Geology and Mineral Resources,
    Chongqing 400042,China;
    3.Chongqing Research Center of State Key Laboratory of Coal Resources and Safe Mining, Chongqing Institute of Geology and Mineral Resources, Chongqing 400042,China

Received date: 2015-09-21

  Revised date: 2015-11-20

  Online published: 2016-07-25

摘要

以重庆市隧道工程建设过程中日益凸显的地质环境问题为研究对象,运用层次分析法和专家打分法,通过遴选指标、确定权重构建了综合评价模型,并对重庆市绕城高速玉峰山隧道进行了地质环境负效应评价。根据综合评价分级标准,将玉峰山隧道地质环境负效应分为4个等级,分别为严重区、较严重区、中等区、较轻区。通过调查验证,评价结果与实际情况一致性较好。研究为该评价方法的推广应用奠定了基础。

本文引用格式

任秀文 , 彭海游 , 杨乐 , 尚红光 , 胡小军 , 冯樊 . 重庆市隧道工程地质环境负效应评价体系[J]. 长江科学院院报, 2016 , 33(8) : 109 -113 . DOI: 10.11988/ckyyb.20150806

Abstract

The geological environment problems which become increasingly prominent in Chongqing tunnel engineering construction process are taken as research objects in this paper. Applying methods of anlaytic hierarchy and scoring by experts,we establish a comprehensive evaluation model by selecting indices and determining the weights of indices. Then, we evaluate the geological environmental negative effect of Yufengshan tunnel of highway-ring around Chongqing; according to the comprehensive evaluation grading standard, we divide the negative effect area into four grades, which are serious area, relatively serious area, medium area and relatively minor area. Through investigation and verification, we found that the evaluation results are basically in accordance with actual situation and the study lays a foundation for the popularization and application of the evaluation method.

参考文献

[1] 李耐霞.歌乐山隧道施工过程对水环境影响研究.成都:西南交通大学,2004.
刘向远.岩溶隧道施工中地下水环境负效应评价指标体系研究 .成都:西南交通大学,2007.
刘 建,刘 丹. 基于模糊层次分析法的隧道工程地下水环境负效应评价.三峡环境与生态,2009,2(1):53-54.
WASIL E,GOLDEN B. Celebrating 25 Years of AHP-Based Decision Making.Computers and Operating Research,2003,30(10):1419-1420.
杜锦婷,李 晓.某隧道涌水量预测及地下水负效应环境评价.地下水, 2012, 34(2): 23-27.
杨 乐,彭海游. 基于层次分析法的奉节县城地质环境承载力评价. 重庆交通大学学报(自然科学版),2013,27(6):776-780.
秦 趣,张美竹,杨 琴,等. 重庆三峡库区生态经济区县域生态系统健康评价.长江科学院院报,2013,30(12) :15-16.
李 聪,申思然,刘 江,等.基于动态权重的土质岸坡稳定性模糊评价方法.长江科学院院报,2013,30(1):16-18.
曹翔宇. 重庆市绕城高速玉峰山隧道工程地质勘察报告. 重庆:重庆136地质队,2005.
文章导航

/

〈 〉