水工结构与材料

丹江口大坝高水头水泥-化学复合灌浆试验研究

  • 闵征辉 ,
  • 施华堂
展开
  • 长江勘测规划设计研究有限责任公司 枢纽处,武汉 430010
闵征辉(1984-),男,湖北武汉人,工程师,从事岩土工程及基础处理的设计与科研工作,(电话)027-82829256(电子信箱)minzhenghui@cjwsjy.com.cn。

收稿日期: 2013-05-16

  修回日期: 2014-07-03

  网络出版日期: 2014-07-04

基金资助

国家“十一五”科技支撑计划课题(2006BAB04A01)

Experimental Research of Cement-chemical Compound Grouting under High Water Head at Danjiangkou Hydro-junction

  • MIN Zheng-hui ,
  • SHI Hua-tang
Expand
  • Department of Hydro-complex Design, Changjiang Institute of Survey, Planning, Design and Research, Wuhan 430010, China

Received date: 2013-05-16

  Revised date: 2014-07-03

  Online published: 2014-07-04

摘要

丹江口水利枢纽帷幕补强灌浆系在高水头、细微裂隙发育、反复灌浆条件下进行,补强灌浆难度大。为了探求经济有效的灌浆形式,分析了目前高水头帷幕灌浆方式,详细介绍了现场复合灌浆试验设计方案、关键施工工艺及灌后检查成果;并分别对压水资料、声波测试成果和疲劳压水成果进行分析。结果表明:水泥-化学复合灌浆具有处理效果好、节约投资及节省工期等优点,能有效解决丹江口坝基帷幕补强灌浆问题。

本文引用格式

闵征辉 , 施华堂 . 丹江口大坝高水头水泥-化学复合灌浆试验研究[J]. 长江科学院院报, 2014 , 31(7) : 70 -73 . DOI: 10.3969/j.issn.1001-5485.2014.07.013

Abstract

The strengthening grouting of Danjiangkou dam heightening project requires great effort because it is carried out in conditions of reservoir high water head, developed micro-fissures and multiple groutings. In order to explore an economic and effective grouting method, current methods of curtain grouting in the presence of high water head are analyzed. On this basis, a detailed introduction of compound grouting test design, key construction technologies and inspection after grouting is given. The test results are analyzed in terms of pressurized water data, acoustic wave test, and fatigue pressurized water. Results reveal that cement-chemical compound grouting is effective, saves investment and shortens construction period. It is a good example for other engineering design and construction for curtain grouting under high head.

参考文献

[1] 蔡汉生,王 利. 江垭大坝坝基防渗帷幕缺陷及其处理[J]. 水利水电快报, 2002,23(10):15-16. (CAI Hai-sheng, WANG Li. Curtain Grouting Defects and Their Treatment in Jiangya Dam Foundation [J]. Express Water Resources & Hydropower Information,2002,23(10):15-16.(in Chinese))
[2] 许明显,沈自力. 高水头条件下进行坝基帷幕灌浆处理的工程实践[J]. 浙江水利科技,2003,(1):76-77. (XU Ming-xian, SHEN Zi-li. The Engineering Practice of Dam Foundation Treatment on Curtain Grouting under High Water Head[J]. Zhejiang Hydrotechnics,2003,(1):76-77.(in Chinese))
[3] 陈 昊,董建军,谭日升. 湿磨细水泥-化学复合灌浆在三峡工程基础处理中的应用研究[J]. 长江科学院报,2006,23(4):64-66. (CHEN Hao, DONG Jian-jun, TAN Ri-sheng. Study on Fine Ground Cement and Chemical Compound Grouting for Foundation Treatment of TGP[J]. Journal of Yangtze River Scientific Research Institute,2006,23(4):64-66. (in Chinese))
[4] 邢林生. 陈村大坝补强加固工程取得良好效果[J]. 水利水电技术,1994,(1):60-63. (XING Lin-sheng. The Good Effect of Reinforcement Engineering at Chencun Dam[J]. Water Resources and Hydropower Engineering, 1994, (1): 60-63. (in Chinese))
文章导航

/