长江科学院院报 ›› 2014, Vol. 31 ›› Issue (4): 68-71.DOI: 10.3969/j.issn.1001-5485.2014.04.0152014, 31(04):68-71

• 岩土工程 • 上一篇    下一篇

挤压边墙施工法的面板坝有限元计算分析

丁 林a, 姚纬明a, 李同春a, b, 赵开伟a   

  1. 河海大学 a.水利水电学院;b.水资源高效利用与工程安全国家工程研究中心, 南京 210098
  • 收稿日期:2013-10-12 修回日期:2014-04-04 出版日期:2014-04-01 发布日期:2014-04-04
  • 作者简介:丁 林(1988-), 男, 湖北武汉人, 硕士研究生, 主要从事水工结构方面的研究, (电话)15850678695(电子信箱)dlastre@126.com。

Finite Element Analysis on Extruded Sidewallof Concrete Face Rock Fill Dam

DING Lin1, YAO Wei-ming1, LI Tong-chun1, 2, ZHAO Kai-wei1   

  1. 1.College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098;2.National Engineering Research Center of Water Resources Efficient Utilizationand Engineering Safety, Hohai University, Nanjing 210098, China
  • Received:2013-10-12 Revised:2014-04-04 Published:2014-04-01 Online:2014-04-04

摘要: 为深入了解挤压边墙对面板堆石坝结构性态的影响, 以某工程面板堆石坝为对象, 建立典型断面的平面模型, 其中该模型包括非简化的挤压边墙和简化的等效厚度的挤压边墙2个模型。通过非线性有限元计算方法, 对比分析了原始施工方法和挤压边墙施工方法的大坝应力变形状态;分析挤压边墙取等效厚度的计算是否合理;研究挤压边墙对整体面板和堆石体的应力和变形的影响。通过分析得出, 挤压边墙对堆石体影响不大, 而且有效地减小了面板在竣工期和蓄水期的挠度变形和应力, 使工程更加安全经济。研究成果为挤压边墙施工的推广提供参考。

关键词: 挤压边墙, 面板堆石坝, 有限元单元法, 应力变形

Abstract: Extrusion side wall as a construction technique used in the upstream slope of rock-fill dam with concrete panel has been widely used in many projects. To understand the static and dynamic effect of extruded side wall acting on the rock-fill dam with concrete panel, 2-D models of typical section of a concrete-faced rockfill dam are built, which contain the real extruded side wall and the extruded side wall with an equivalent thickness. The stress state and deformation state using the original construction method and the extruded side wall technique are compared and analyzed by non-linear finite element calculation. The rationality of extruded side wall’s approximate treatment with an equivalent thickness is verified. Moreover, the effect of extruded side wall on the stress and deformation of panel and rock-fill body is researched. It’s concluded that extruded side wall reduces the deflection deformation and stress of panel during construction finishing period and impounding period, but has no apparent impact on rock-fill body. It makes the project safer and more economical, and is worth popularization.

Key words: extruded side wall, concrete-faced rock-fill dam, FEM, stress and deformation

中图分类号: