[1] 赵建坤, 张晓雷, 张桂花, 等. 大石涧水库溢流坝挑流鼻坎体型优化试验研究[J]. 人民黄河, 2021, 43(3): 151-154. (ZHAO Jian-kun, ZHANG Xiao-lei, ZHANG Gui-hua, et al. Experimental Study on Body-type Optimizing of Flip Bucket of Dashijian Reservoir Overflow Dam[J]. Yellow River, 2021, 43(3): 151-154.(in Chinese))
[2] 傅长锋, 韩李明, 尹健婷, 等. 挑流消能水工模型试验及挑距、冲刷坑深度估算方法[J]. 水电能源科学, 2021, 39(12): 137-140. (FU Chang-feng, HAN Li-ming, YIN Jian-ting, et al. Hydraulic Model Test of Ski-jump Energy Dissipation and Flip Nappe Distance and Scour Pit Depth Estimation Method[J]. Water Resources and Power, 2021, 39(12): 137-140.(in Chinese))
[3] 陈椿庭. 关于高坝挑流消能和局部冲刷深度的一个估算方法[J]. 水利学报, 1963(2) :15-26. (CHEN Chun-ting. An Estimation Method for Energy Dissipation and Local Scour Depth of High DAMS[J]. Journal of Hydraulic Engineering, 1963(2): 15-26.(in Chinese))
[4] PATANKAR S V, SPALDING D B. A Calculation Procedure for Heat, Mass and Momentum Transfer in Three-dimensional Parabolic Flows[J]. Journal of Heat Mass Transfer, 1972, 15(10) :1787-1806.
[5] 毛 野. 有关岩基冲刷机理的探讨[J]. 水利学报, 1982(2) :48-56. (MAO Ye. Discussion on Erosion Mechanism of Batholith[J]. Journal of Hydraulic Engineering, 1982(2) : 48-56. (in Chinese))
[6] 赵耀南, 梁兴蓉. 水流脉动压力沿缝隙的传播规律[J]. 天津大学学报, 1988(3) :58-68.(ZHAO Yao-nan, LIANG Xing-rong. Propagation Law of Water Pulsating Pressure Along Crevice[J]. Journal of Tianjin University, 1988(3): 58-68.(in Chinese))
[7] 刘沛清, 冬俊瑞, 李永祥, 等. 在冲坑底部岩块上脉动上举力的实验研究[J]. 水利学报, 1995, 26(12): 59-66. (LIU Pei-qing, DONG Jun-rui, LI Yong-xiang, et al. Experimental Study of Fluctuating Uplift at the Bottom of a Scour Pool[J]. Journal of Hydraulic Engineering, 1995, 26(12): 59-66.(in Chinese))
[8] 陈 辉, 姜伯乐, 陈 端. 某电站泄洪雾流降雨数值计算研究[J]. 长江科学院院报, 2013, 30(8): 58-62.(CHEN Hui, JIANG Bo-le, CHEN Duan. Study on the Flood Discharging Atomization in Hydropower Station by Mathematical Model[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(8): 58-62.(in Chinese))
[9] 陈 辉,周卓亮,刘火箭,等.施工围堰缩窄引航道对坝区通航水流的影响[J].人民长江,2020(增刊1):223-227.(CHEN Hui,ZHOU Zhuo-liang,LIU Huo-jian,et al. Influence of Construction Cofferdam to Narrow Approach Channel on Navigable Water Flow in Dam Area[J]. Yangtze River, 2020 (Supp.1): 223-227. (in Chinese))
[10]王 瑞,聂源宏.玛尔挡水电站溢洪道挑流鼻坎体型试验研究[J].中国农村水利水电,2019(9):211-215.(WANG Rui,NIE Yuan-hong.Experimental Investigations of Flip Bucket for Maerdang Hydropower Station Spillway[J]. China Rural Water and Hydropower, 2019(9): 211-215.(in Chinese))
[11]双学珍,于广斌,张婧镁,等.基于挑坎优化的护岸不护底水垫塘底板冲刷试验[J].人民长江,2020,51(7):162-167.(SHUANG Xue-zhen,YU Guang-bin,ZHANG Jing-mei,et al. Scouring Test on Plunge Pool with Protected Bank and Unprotected Bottom Plate by Flip Bucket Style Optimization[J]. Yangtze River, 2020, 51(7): 162-167.(in Chinese))
[12]李松平, 赵玉良, 赵雪萍, 等. 河口村水库泄洪洞水工模型试验研究[J]. 人民黄河, 2015, 37(1): 119-120, 129. (LI Song-ping, ZHAO Yu-liang, ZHAO Xue-ping, et al. Experimental Study on Hydraulic Model of Flood Discharging Tunnel of Hekoucun Reservoir[J]. Yellow River, 2015, 37(1): 119-120, 129.(in Chinese))
[13]田 莉,赵 涛.某水库溢洪道出口挑流鼻坎优化试验研究[J].人民黄河,2013,35(8):132-133,136.(TIAN Li,ZHAO Tao.Experimental Study on a Reservoir Spillway Export Pick Flow Nose Bar Optimization[J]. Yellow River,2013,35(8):132-133,136.(in Chinese))
[14]董金玉, 王庆祥, 王晓亮. 拉哇水电站高水头大泄量泄水建筑物布置与设计[J]. 水力发电, 2020, 46(9): 80-83, 119. (DONG Jin-yu, WANG Qing-xiang, WANG Xiao-liang. Layout and Design of Discharge Structures with High-head and Large-discharge for Lawa Hydropower Station[J]. Water Power, 2020, 46(9): 80-83, 119.(in Chinese))
[15]辜晋德,徐建荣,彭 育,等.高拱坝非对称泄洪消能布置优化试验研究[J].长江科学院院报,2021,38(5):61-65.(GU Jin-de,XU Jian-rong,PENG Yu,et al. Experimental Study on Optimizing Asymmetric Hydraulic Structure of Flood Discharge Energy Dissipation for High Arch Dam[J]. Journal of Yangtze River Scientific Research Institute,2021,38(5):61-65.(in Chinese))
[16]黄国兵,谢世平,段文刚.高坝泄洪挑流消能工优化研究与应用[J].长江科学院院报,2011,28(10):90-93.(HUANG Guo-bing,XIE Shi-ping,DUAN Wen-gang.Optimization and Application of Energy Dissipation Works for Ski Jump Spillway at High Dams[J]. Journal of Yangtze River Scientific Research Institute,2011,28(10):90-93.(in Chinese))
[17]杨家修,张陆陈,庞博慧,等.高土石坝大交角挑流消能水垫塘优化布置[J].水利水电科技进展,2020,40(5):9-12.(YANG Jia-xiu,ZHANG Lu-chen,PANG Bo-hui,et al. Optimizing Layout of Plunge Pool for a High Earth Dam with Large Angle of Ski-jump Energy Dissipation[J]. Advances in Science and Technology of Water Resources,2020,40(5):9-12.(in Chinese))