[1] 刘永绣.板桩码头向深水化发展的方案构思和实践——遮帘式板桩码头新结构的开发[J].港工技术,2005,(12):12-15.(LIU Yong-xiu.Design Conception and Practice of Building Sheet Pile Wharfs in Deep Waters Development of A New Structure of Covered Type of Sheet Pile Wharf[J].Port Engineering Technology,2005,(12):12-15.(in Chinese))
[2] 吕 宁,蔡正银,徐光明,等.遮帘式板桩码头结构设计方案的优化与验证[J] 港工技术,2005,(2):22-24.(LV Ning,CAI Zheng-yin,XU Guang-ming,et al.Optimization for the Design of A New Type of Covered Sheet Pile Wharf[J].Port Engineering Technology,2005,(2):22-24.(in Chinese))
[3] 崔冠辰,蔡正银,李小梅,等.遮帘式板桩码头工作机理初探[J].岩土工程学报,2012,34(4):762–766.(CUI Guan-chen,CAI Zheng-yin,LI Xiao-mei,et al.Preliminary Investigation on Working Mechanism of Covered Sheet-pile Wharfs[J].Chinese Journal of Geotechnical Engineering,2012,34(4):762–766.(in Chinese))
[4] 司海宝,蔡正银,俞 缙.遮帘式板桩码头结构与土共同作用3D数值模拟分析[J].土木工程学报,2012,45(5): 182-190.(SI Hai-bao,CAI Zheng-yin,YU Jin.3D Numerical Modeling of Pile-soil Interaction for Covered Sheet-piled Wharf[J].China Civil Engineering Journal,2012,45(5):182-190.(in Chinese))
[5] 李景林,蔡正银,徐光明,等.遮帘式板桩码头结构离心模型试验研究[J].岩石力学与工程学报,2007,26(6):1182-1187.(LI Jing-lin,CAI Zhen-yin,XU Guang-ming,et al.Centrifuge Modeling Test on Covered Sheet-piled Structure of Wharf[J] Chinese Journal of Geotechnical Engineering,2007,26(6):1182-1187.(in Chinese))
[6] 张 昊,高玉峰,谭慧明,等.遮帘式板桩码头变形机制有限元分析[J].长江科学院院报,2014,31(7):81-85.(ZHANG Hao,GAO Yu-feng,TAN Hui-min,et al.Finite Element Analysis on Deformation Mechanism of Sheet-pile Quay Wall with Barrier Piles[J] Journal of Yangtze River Scientific Research Institute,2014,31(7):81-85.(in Chinese))
[7] 王成华,陈永波,林立相.抗滑桩间土拱特性及最大桩间距分析[J].山地学报,2001,19(6):556-559.(WANG Cheng-hua,CHEN Yong-bo,LIN Li-xiang.Soil Arch Mechanical Character and Suitable Space of Anti-sliding Pile[J].Journal of Mountain Science,2001,19(6):556-559.(in Chinese))
[8] 黄 伟,潘 泓,王燕燕.全遮帘式板桩码头结构遮帘桩合理桩间距确定[J].地下工程与空间学报,2012,8(1):129-134.(HUANG Wei,PAN Hong,WANG Yan-yan.Determination on Rational Spacing of Barrier Pile for All-covered Type of Sheet Pile Wharf[J].Chinese Journal of Underground Space and Engineering,2012,8(1):129-134.(in Chinese))
[9] 章玲玲,林 海.基于土拱效应的板桩码头遮帘桩间距的设计计算[J].岩土工程学报,2013 35(增2):1134-1137.(ZHANG Ling-ling,LIN Hai.Design Calculation on Spacing of Barrier Piles for Sheet-pile Wharf Based on Soil-arching Effect[J].Chinese Journal of Geotechnical Engineering,2013,35(Sup.2):1134-1137.(in Chinese))
[10]林治平,刘祚秋,商秋婷.抗滑桩结构土拱的分拆与联合研究[J].岩土力学,2012,33(10):3109-3114.(LIN Zhi-ping,LIU Zuo-qiu,SHANG Qiu-ting.Research on Soil Arch of Anti-slide Pile Structure with Methods of Separation and Combination[J].Rock and Soil Mechanics,2012,33(10):3109-3114.(in Chinese))
[11]李 静.遮帘式板桩码头结构的受力分析及合理桩间距的确定[D].青岛:中国海洋大学,2009.(LI Jing.The Mechanical Analysis for Covered Type of Sheet Pile Wharf and Determination of Rational Pile Spacing [D].Qingdao:Ocean University of China,2009.(in Chinese))
[12]张金民.桩锚支挡结构体系中考虑桩间拱效应的挡板土压力计算[D].重庆:重庆大学,2002.(ZHANG Jin-min.Calculation of Soil Stress on Holding Sheet of Pile-anchor Retaining Structure Considering the Effect of Arch Between Piles[D].Chongqing:Chongqing University,2002.(in Chinese))
[13]蔡正银,李景林,徐光明,等.京唐港32#泊位工程原型观测报告[R].南京:南京水利科学研究院,2008.(CAI Zhen-yin,LI Jing-lin,XU Guang-ming,et al.Prototype Observation Report on 32# Berth Project of Jing-Tang Port[R].Nangjing:Nangjing Hydraulic Research Institute,2008.(in Chinese))
[14]李 斌.遮帘式板桩码头结构土压力算法及承载特性研究[D].天津:天津大学,2010.( LI Bin.Research on the Earth Pressure Arithmetic and Load Bearing Character of Wharf Structure with Covered Sheet Pile [D].Tianjin:Tianjin University,2010.(in Chinese))